My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-029F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-029F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:19:43 PM
Creation date
2/20/2018 1:35:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/13/2018
Control Number
2018-029F
Agenda Item Number
8.N.
Entity Name
Kimley Horn and Associates
Subject
Floridan Wellfield Assessment and Improvements
Alternate Name
Well Performance Field Testing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B -1'EE SCHEDULE <br />1 <br />8 -Jan -18 <br />—_ <br />PROJECT: IRCU WELLFIELD ASSESSMENT AND IMPROVEMENTS j <br />' <br />;SHEEP <br />I OF <br />1 <br />_ <br />CLIENT: Indian River County Utilities i <br />;FILE NO.' <br />ESTIMATOR: MDM ( <br />i <br />;DATE -12/15/17 <br />DESCRIPTION: <br />EVA LUATION, TESTING, AND ASSESSMENT <br />DIRECT LABOR <br />( MAN-HOURS) <br />--- <br />REG Drc Evp UNE <br />SEN PROF DES/ CLK EXP TOTAL <br />PRINC PROF TH/FH P2 PI SUB <br />NO. TASK <br />1 WELL PERFORMANCETESTING <br />Field Testing/coordination <br />2 <br />8 <br />16 <br />500 <br />$153 <br />$3,983 <br />Prepare Tech Memo <br />6 <br />12 <br />2 <br />$129 <br />$2,931 <br />_ <br />_ <br />SUB _ - JLA <br />$12,384 <br />$0 <br />$12,384 <br />_ <br />$19,_2.98 <br />2 EXISTINGWELLASSESSMENTS <br />Kick-offmeeting2 <br />4 <br />4 <br />$66 <br />$1,500 <br />1-2 day walkthrough <br />8 <br />8 <br />16 <br />$2151 <br />$4,895 <br />Hydraulic modelling <br />4 <br />4 <br />16 <br />4 <br />$1641 <br />$3,728 <br />Review motor failures (Hobart) <br />6 <br />4 <br />$90 <br />$2,040 <br />a __ <br />Attend reviewmeetings <br />1 <br />6 <br />81 <br />4 <br />1 <br />$137 <br />$3,107 <br />Evalute pump selections, spare parts, aux ower <br />8 <br />8 <br />8 <br />$177 <br />$4,017 <br />Evaluate electrical (C&W 66406) <br />$7,000 <br />$0 <br />$7,000 <br />Raw water uality <br />4 <br />6 <br />$701 <br />$1,600 <br />$27,887 <br />3 SCADA SYSTEM EVALUATION <br />Review/update fiber optic improvements (CSD) <br />6 <br />6 <br />4 <br />$5,000 <br />$121 <br />$7,7551—___ <br />Individual well improvements <br />12 <br />4 <br />18 <br />4 <br />$256 <br />$5,830 <br />SUB -C&W <br />$12,000 <br />$0 <br />$12,000 <br />$25_,585 <br />4 PREPARETECH REPORT & DESIGN GUIDES <br />Meetings <br />6 <br />6 <br />$1041 <br />$2,354 <br />_ <br />Design guidelines <br />8 <br />12 <br />12 <br />$219 <br />$4,971 <br />— <br />Surnaury report <br />6 <br />18 <br />22 <br />12 <br />$346 <br />$7,858 <br />---_-- <br />$152183 <br />TOTALHOURS! <br />0 <br />84 <br />90 <br />118 <br />42 <br />$36,884 <br />$2,247 <br />$87,953 <br />$87,9_53 <br />LABOR ($/HOUR): <br />235 <br />2251 <br />150 <br />105 <br />96 <br />$0 <br />$0 <br />SUBTOTAL! 0 <br />189001 <br />13500 <br />12390 <br />4032 <br />0 <br />$48,822 <br />$0 <br />__ <br />FAUtilities\UTILITY - Engineering\WATER\Wells\Admin\IRCU Floridan Well Improvements 1.29.18.docx Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.