Laserfiche WebLink
Schulke, Bittle & Stoddard, LLC <br />Engineer's Site Construction Cost Estimate <br />For: GHO Berkley Square - Samuel Lane Cul -De -Sac <br />11/19/2015 <br />PROFESSIONAL <br />SBS ESTIMATE <br />Surveying Reset PCP <br />ITEM <br />UNIT <br />QUANTITY <br />UNIT PRICE <br />LS 1 $ 500.00 <br />TOTAL <br />PAVING / GRADING / EARTHWORK <br />Engineering (Inspection & Certification <br />LS 1 $ 500.00 <br />$ <br />500.00 <br />Mobilization <br />LS <br />1 <br />$ 500.00 <br />$ <br />500.00 <br />5/8" Mill Asphalt Paving <br />SY <br />820 <br />$ 2.54 <br />$ <br />2,082.80 <br />3/4" Asphalt Pavin(overlay) <br />SY <br />820.0 <br />$ 9.03 <br />$ <br />7,404.60 <br />8" Coquina and Additional Asphalt (repair / rework <br />LS <br />1 <br />$ 5,000.00 <br />$ <br />5,000.00 <br />Subtotal <br />$ <br />14,987.40 <br />PROFESSIONAL <br />Surveying Reset PCP <br />LS 1 $ 250.00 <br />$ <br />250.00 <br />Engineering (Testing) <br />LS 1 $ 500.00 <br />$ <br />500.00 <br />Engineering (Inspection & Certification <br />LS 1 $ 500.00 <br />$ <br />500.00 <br />Subtotal <br />$ <br />1,250.00 <br />TOTAL <br />Paving / Grading / Earthwork $ 14,987.40 <br />Professional $ 1,250.00 <br />TOTAL $ 16,237.40 <br />Guarantee Bond Amount (125%) $20,296.75 / <br />�i <br />I hereby certify that the total a nt f e Construction Cost Estimate prepared <br />by Schulke, 6iftle 8 Stodd LLC fficient to complete all required improvements <br />for the GR erJcely S are <br />Name:.3 <br />License #: `+ d K7 <br />/ 6 �: <br />Signature: � 41/LyL• <br />� 7 �-F+ <br />Date <br />EXHIBIT "A" <br />STATE OF FLORIDA <br />INDIAN RIVER COUNTY <br />I THIS IS TO CERTIFY THAT THIS IS <br />A TRUE AND CORRECT COPY OF <br />f THE ORIGINAL ON FILE IN THIS <br />1 OFFICE. <br />By <br />DATE <br />D.c <br />