Laserfiche WebLink
DEC BOOK 88 2,42 <br />Utilities and Services <br />The subje t <br />c property is within the Urban Service Area of the <br />county. As such, the site has access to the services needed to <br />accommodate urban development. For potable water, the site is <br />currently serviced by the South County Water Plant; however, when <br />the North County Water Plant is completed, potable water service <br />will be provided by that facility. Wastewater service is available <br />to the site from the Central County Wastewater Plant (Gifford). <br />Transvortation System <br />The property abuts 49th Street to the north and 47th Street to the <br />south. Forty-ninth Street is classified as a collector road on the <br />future roadway thoroughfare plan map. This segment of 49th Street <br />is a 2 -lane paved road with approximately 35 feet of existing <br />public road right of way. It is programmed for expansion to 60 <br />feet of public road right of way by 2010. Forty-seventh Street is <br />a 2 -lane paved road with approximately 70 feet of existing public <br />road right of way. <br />ANALYSIS <br />In this section, an analysis of the reasonableness of the <br />application will be presented. The analysis will include a <br />description of: <br />• <br />concurrency of public facilities; <br />• compatibility with the surrounding area; <br />• consistency with the comprehensive plan; and <br />• potential impact on environmental quality. <br />Concurrency of Public Facilities <br />This site is located within the county Urban Service Area, an area <br />deemed suited for urban scale development. The Comprehensive Plan <br />establishes standards for: Transportation, Potable Water, <br />Wastewater, Solid Waste, Drainage and Recreation (Future Land Use <br />Policy 3.1). The adequate provision of these services is necessary <br />to ensure the continued quality of life enjoyed by the community. <br />The Comprehensive Plan and Land Development Regulations also <br />require that new development be reviewed to ensure that the minimum <br />acceptable standards for these services and facilities are <br />maintained. <br />Policy 3.2 of the Future Land Use Element states that no <br />development shall be approved unless it is consistent with the <br />concurrency management system component of the Capital Improvements <br />Element. For rezoning requests, conditional concurrency review is <br />required. <br />Conditional concurrency review examines the available capacity of <br />each facility with respect to a proposed project. Since rezoning <br />requests are not projects, county regulations call for the <br />concurrency review to be based upon the most intense use of the <br />subject property based upon the requested zoning district. The <br />site information used for the concurrency analysis is as follows: <br />1. Size of Property: ±15.41 acres <br />2• Size of Area to be Rezoned: ±15.41 acres <br />34 <br />�_ J <br />M <br />