Laserfiche WebLink
K• <br />MAR f 8 1993 <br />BOOK 89 PAGE 61 <br />ORDINANCE 93-Z <br />a. A proposed development shall be determined to <br />be a "potential airport obstruction" if the <br />proposed development would result in a <br />structure or natural vegetation having a <br />height greater than an imaginary surface <br />extending outward and upward from the ends and <br />sides'of a publically licensed airport active <br />runway at a slope of 1 foot vertical to 100 <br />feet horizontal outward to 20,000 feet for <br />Subzone A or 200 feet above ground level for <br />Subzone B. Applicants of any development <br />proposal determined by the county to result in <br />a structure(s) that constitutes a "potential <br />airport obstruction" shall be issued a Notice <br />of Potential Airport Obstruction during the <br />development proposal review process by the <br />community development director or his <br />designee. <br />i. No proposal for development will be <br />approved for construction and no permit <br />for construction will be issued for any <br />proposal to construct any structure which <br />is determined by the county to be a <br />"potential airport obstruction" unless a <br />county Airport Construction Permit is <br />granted or unless a county Airport <br />Obstruction Variance is granted. <br />b. Any proposed development which is not <br />determined to be a "potential airport <br />obstruction" is exempt from any airport height <br />notification zone permitting regulations <br />contained herein. <br />3. Airport Construction Permit Procedures and Criteria <br />for Approval. Any -applicant affected -by a Notice <br />of Potential Obstruction may apply to the community <br />development director for an Airport Construction <br />Permit. <br />a. Procedures for Obtaining an Airport <br />Construction Permit. <br />i. Applicants shall submit to the Planning <br />Division a completed Airport Construction <br />Permit application form (as provided by <br />the county) and a copy of the notice of <br />proposed construction form submitted to <br />the FAA for the project. Permit requests <br />may be considered by the community <br />development director concurrent with <br />development plan approval consideration. <br />ii. Prior to permit requests being considered <br />for approval, applicants shall submit to <br />the Planning Division the final <br />Determination issued by the FAA based on <br />its review of the applicants Notice of <br />Proposed Construction submitted in <br />accordance with 14 CFR Part 77. <br />b. Criteria for Granting an Airport Construction <br />Permit. <br />Coding: Words in blocked -out type are deletions from existing law. <br />Words underlined are additions. <br />3 <br />10 <br />