My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/18/1993
CBCC
>
Meetings
>
1990's
>
1993
>
3/18/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 11:02:28 AM
Creation date
6/16/2015 12:54:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
03/18/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 93- 8 <br />SECTION 22: Section 954.11 is hereby established to read as <br />follows: <br />Section 954.11 Security for construction of required paving <br />improvements <br />For projects projected to generate/attract less than one hundred <br />(100) average daily trips, a certificate of occupancy (C.O.) may be <br />issued without construction of required driveway/parking area <br />paving improvements if a contract for construction of required <br />paving improvements has been properly executed and if security has <br />been posted in an amount equal to one hundred fifteen (115) percent <br />of the estimated cost of the required paving improvements. <br />(A) The contract shall be on a form provided by the county <br />and shall obligate the developer to complete all required <br />paving improvements, in accordance with the approved site <br />plan(s) and county development regulations and standards, <br />within a period of twenty-four months of the date of the <br />C.O. <br />(B) The estimated cost of paving shall be approved by the <br />county engineer after review of an itemized cost estimate <br />certified by the developer's engineer or review of an <br />actual itemized contract price bid. <br />(C) The surety posted to guarantee performance of the <br />contract shall expire, if at all, no less than ninety <br />(90) days beyond the last date for performance <br />established by the contract. The surety shall run in <br />favor of the board of county commissioners, must be in a <br />form acceptable to the county attorney, and may be <br />either: <br />1. A cash deposit and escrow agreement governing <br />control and use thereof; or <br />2. An irrevocable letter of credit, (issued by a <br />financial institution authorized to conduct <br />business within the state. <br />SECTION 23: Amend Section 971.08(10), to read as follows: <br />"(10) Sludge spreading (administrative permit). <br />(a) Districts requiring administrative permit approval, (pursuant <br />to the provisions of 971.04): A-1 A-2 A-3. <br />Coding: Words in type are deletions from existing law. <br />Words underlined are additions. <br />13 <br />blocked -out <br />33 <br />MAR 18 1993 <br />BOOK 89 F';,E 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.