Laserfiche WebLink
i `J <br />BOOK 89 F;.cr 146 <br />DESCRIPTION <br />CURRENT FEE <br />NEW FEES <br />As ado ted in exisft resolution) <br />EFFECTIVE 5/1/93 <br />GAS <br />The following shall include bottle gas: <br />For the first outlet and/or appliance <br />$4.50 <br />$10.00 <br />For each additional outlet and/or appliance ' <br />$1.50 <br />For change from a master to an individual <br />meter <br />$2.00 <br />$2.50 per outlet <br />For multiple meters at one location: <br />First meter <br />$2.50 <br />Fach Addtl meter <br />$1.00 <br />For major repairs to gas pipe where no <br />fixture or appliance installation is involved <br />$3.00 <br />MINIMUM FEE: $30.00 <br />BOILERS: <br />Minimum permit fee for installations not to <br />$5.00 <br />$10.00 <br />exceed $100 <br />Each $500 or fraction thereafter <br />$3.00 <br />$6.00 <br />MINIMUM FEE: $30.00 <br />FURNACES AND HEATING <br />EQUIPMENT/UNIT INSTALLED: <br />For the first 100,000 BTU/hour or <br />$7.00 <br />$12.00 <br />fractional part <br />Each additional 100,000 BTU/hour or <br />$3.00 <br />$5.00 <br />fractional part <br />(Note: The rating of furnace and heating <br />MINIMUM FEE: $30.00 <br />equipment shall be based on the BTU input <br />of fuel used/hour. <br />WELLS: <br />Delete -Environmental <br />Drilling or digging <br />$5.00 <br />Health Departinent <br />SPRINKLER SYSTEMS': <br />$4.00 <br />SET FEE $30.00 <br />WATER STORAGE TANKS: <br />Up to 1,000 gallons <br />$6.00 <br />$12.00 <br />Each additional 1,000 gallons or fraction <br />$1.50 <br />$3.00 <br />MINIMUM FEE: $30.00 <br />SOLAR WATER HEATER SYSTEM: <br />$7.50 <br />SET FEE $30.00 <br />ELECTRIC FEES <br />When application for permit is approved <br />and before a permit is issued, a fee shall be <br />paid on the following schedule or rates: <br />No permit will be issued for a fee of less <br />than:. <br />$5.00 <br />MINIMUM FEE: $30.00 <br />1 - 10 Outlets: <br />LIGHT OUTLETS: <br />$10.00 <br />1-8 outlets, inclusive (minimum) <br />$5.00 <br />Over 8 outlets, the minimum charge for the <br />Each Addtl. outlet <br />first 8 outlets plus.each additional outlet <br />$.10 <br />$.20 <br />M <br />