My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/23/1993
CBCC
>
Meetings
>
1990's
>
1993
>
3/23/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:52 PM
Creation date
6/16/2015 12:55:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/23/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION <br />FEES EFFECTIVE 5/1/93 <br />FIRE SPRINKLER SYSTEM <br />BY VALUATION <br />MINIMUM FEE: $30.00 <br />GAS <br />The following shall include bottle gas: <br />For the first outlet and/or appliance <br />$10.00 <br />Each outlet and/or appliance <br />$2.50 <br />MINIMUM FEE: $30.00 <br />BOILERS: <br />0 - $100 Valuation <br />$10.00 <br />Each additional $500 or fraction thereafter <br />$6.00 <br />MINIMUM FEE: $30.00 <br />FURNACES AND HEATING EQUIPMENT/UNIT <br />INSTALLED: <br />For the first 100,000 BTU/hour or fractional part <br />$12.00 <br />Each additional 100,000 BTU/hour or fractional part <br />$5.00 <br />(Note: The rating of furnace and heating equipment <br />MINIMUM FEE: $30.00 <br />shall be based on the BTU Input of fuel used/hour. ) <br />SPRINKLER SYSTEMS: <br />SET FEE $30.00 <br />WATER STORAGE TANKS: <br />Up to 1,000 gallons <br />$12.00 <br />Each additional 1,000 gallons or fraction thereof <br />$3.00 <br />MINIMUM FEE: $30.00 <br />SOLAR WATER HEATER SYSTEM: <br />SET FEE $30.00 <br />ELECTRIC FEES: <br />When an application for a permit is approved and <br />before a permit is issued, a fee therefore shall be paid <br />based on the followina schedule: <br />No vermit will be issued for a fee of less than: <br />MINIMUM FEE: $30.00 <br />LIGHT OUTLETS: <br />1-10 outlets <br />$10.00 <br />Each additional outlet <br />$.20 <br />SERVICES, SERVICE CHANGES, SWITCHBOARDS OR <br />PANELS: <br />Construction Temporary <br />$12.00 <br />400 Ampere or less <br />$12.00 <br />Each additional 100 ampere over 400 <br />$5.00 <br />MINIMUM FEE: $30.00 <br />57 <br />BOOK 89 PAGE 15.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.