Laserfiche WebLink
BOOK 89 F F 596-7 <br />MAY 18 1 <br />In answer to Commissioner Eggert's question, Utilities <br />Director Terry Pinto confirmed that if GDU can prove the need for <br />a rate increase, there is nothing the Board can do except grant <br />them that right. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Eggert, the Board unanimously (4-0, <br />Commissioner Macht having left the meeting early) <br />authorized staff to proceed with an agreement with <br />Rachlin & Cohen in an amount not to exceed $15,590.00, <br />as set out in the above staff recommendation. <br />SOUTH COUNTY WELLS - CHANGE ORDER #1 - DRILLING SERVICES, INC. <br />The Board reviewed the following memo date 5/5/93: <br />DATE: MAY 5, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRA <br />FROM: TERRANCE G. PI <br />DIRECTOR OF UT I VICES <br />PREPARED WILLI M IN <br />AND STAFFED CAPIT ECTS ENGINEER <br />BY: DEPARAj&L OF UTILITY SERVICES <br />SUBJECT: SOUTH COUNTY WELLS - CHANGE ORDER NO. 1 <br />INDIAN RIVER COUNTY PROJECT NO. UW -91 -07 -WW <br />BACKGROUND <br />On February 23, 1993, the Indian River County Board of County <br />Commissioners approved a contract with Drilling Services, Inc., for <br />the installation of two 16 -inch public supply wells at the South <br />County R.O. Plant (see attached agenda item and minutes). The <br />awarded contract amount was $95,191.50, and the notice to proceed <br />was issued in April 1993. One of the first items involved in this <br />project was the drilling of pilot holes at each site to determine <br />the exact depth of the well surface casing. This has now been <br />accomplished, and it was determined that an additional 195 feet of <br />surface casing would be required between the two wells. We are now <br />before the Board requesting approval of a change order to cover the <br />additional cost associated with this work (see attached PBS&J letter <br />dated April 23, 1993). <br />ANALYSIS <br />As well as the above outlined change, the engineer has recommended <br />enlarging the surface bore hole and deepening the 8 -inch pilot hole <br />depth by 150 IF between the two wells. The proposed additions are <br />based on contract unit prices as follows: <br />Bid Item Description <br />Add <br />Unit Cost <br />Total <br />2 24" casing <br />3 <br />195 IF <br />$132.06 <br />$25,751.70 <br />8° pilot hole <br />6 <br />150 LF <br />8.85 <br />1,327.50 <br />* grout <br />650 Sacks <br />6.45 <br />4.192.50 <br />55 <br />Total <br />$31,271.70 <br />