My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/6/1993
CBCC
>
Meetings
>
1990's
>
1993
>
7/6/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:54 PM
Creation date
6/16/2015 1:11:23 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/06/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL - BOOK 89 <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously (4-0, <br />Commissioner Tippin being absent) approved change <br />order and final pay request in the amount of <br />$18,498.76 to Treasure Coast Contracting, Inc., as <br />recommended by staff. <br />CHANGE ORDER IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />ROSELAND ELEVATED WATER STORAGE TANK <br />The Board reviewed the following memo dated 6/22/93: <br />DATE: JUNE 22, 1993 <br />TO: JAMES E. CHANDLER. <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI9PVICES <br />STAFFED AND <br />PREPARED BY: ROBERT 0. WISEMEN, P.E <br />ENVIRONMENTAL ENGINEERW <br />DEPARTMENT OF UTILITY :ES <br />SUBJECT: ROSELAND ELEVATED WATER STORAGE TANK <br />CHANGE ORDER NO. 1 <br />IRC PROJECT NO. UW -92 -07 -DS <br />BACKGROUND: <br />On March 9, 1993, the Board of County Commissioners approved and <br />awarded the contract for the above -referenced project to Brown Steel <br />Contractors, Inc. (see attached agenda item). The' approved contract <br />price is $861,000.00. <br />ANALYSIS: <br />In preliminary soil investigation, based on historical soil type in <br />the area, the -soil engineers of PSI-Jammal & Associates Division, <br />estimated the depth requirement for pile foundation. On June 3, <br />1993, test pile analysis was conducted using a pile driving analyzer <br />to determine the minimum depth of embedment for said pile. <br />According to the test pile, the minimum pile embedment shall be 65 <br />feet from the surface, which is 10 feet deeper than the initial <br />estimate based on historical data. <br />Based on the approv ' ed unit price for additional piling depth, the <br />$17,280.00 change order is required. The contract price, including <br />this change order, is $878,280.00. <br />RECOMMENDATION: <br />The Department of Utility Services recommends that the Board of <br />county Commissioners approve and execute Change Order No. 1 in the <br />amount of $17,280.00. <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.