My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/6/1993
CBCC
>
Meetings
>
1990's
>
1993
>
7/6/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:54 PM
Creation date
6/16/2015 1:11:23 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/06/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 80 matlool <br />COUNTRYSIDE NORTH WASTEWATER CONNECTION AND PAST -DUE BASE FACILITY <br />FEES <br />Utilities Director Terry Pinto presented the following staff <br />recommendation dated 6/24/93: <br />DATE: JUNE 24p 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI� VICES <br />STAFFED AND <br />PREPARED BY: HARRY E. ASHER <br />ASSISTANT DIRECTOR OF UTILITY SERVICES <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: COUNTRYSIDE NORTH WASTEWATER CONNECTION AND PAST -DUE <br />BASE FACILITY FEES <br />BACKGROUND: <br />As follows is a chronology of events leading to the current <br />connection of Countryside North Mobile Home Park (CMHP) and past -due <br />base facility fees: <br />1. June 5. 1985: On June 5, 1985, the County adopted <br />Resolution 85-61 transferring and amending 'Resolution <br />80-88 from Florida Atlantic Associates to Realcor-Vero <br />Beach Associates, including an agreement relating to <br />wastewater treatment services between the County and <br />Realcor-Vero Beach Associates (copy attached),, which <br />states in Section 3, "DevelgjRer agrees that it will <br />connect the Project to the County wastewater system within <br />county.-, <br />2. October 10, 1986: On October 10, 1986, Utilities notified <br />Realcor that wastewater was -available to Countryside North <br />and to prepare to connect to the County system within 90 <br />days. <br />Various correspondence and actions transpired between <br />October 1986 and 1988 concerning payment of franchise,, <br />impact, and renewal and replacement fees as required under <br />the franchise and June 5, 1985, agreement. Also, in 1987, <br />Countryside South (287 lots) was connected to the County <br />water and wastewater system. <br />3. ARril-12. 1990: On April 12,, 1990# Utilities notified <br />Realcor to connect to the County wastewater system within <br />60 days as outlined in the June 5, 1985, agreement (copy <br />attached). Subsequently, various correspondence between <br />County, Realcor, and Realcor's engineer occurred on May 8, <br />11, 24, and 29, and on June 10 and 11, 1990, regarding the <br />required force main connection point. <br />9K, <br />
The URL can be used to link to this page
Your browser does not support the video tag.