My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/27/1993
CBCC
>
Meetings
>
1990's
>
1993
>
7/27/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:54 PM
Creation date
6/16/2015 1:08:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/27/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fr_ J U L 2 7 <br />�A <br />BOOK 9 <br />WEST REGIONAL WASTEWATER TREATMENT PLANT EXPANSION TO 2 MGD <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated July 20, 1993: <br />DATE: JULY 20, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRA' <br />FROM: TERRANCE G. PINTO//y./ <br />DIRECTOR OF UTILI �// SERVICES <br />PREPARED WILL M IN <br />AND STAFFED CAP ECTS ENGINEER <br />BY: DEP OF UTILITY SERVICES <br />SUBJECT: WEST REGIONAL WASTEWATER TREATMENT PLANT <br />EXPANSION TO 2 MGD <br />INDIAN RIVER COUNTY PROJECT NO. US -93 -03 -CS <br />BACKGROUND <br />On April 27, 1993, the Indian River County Board of County <br />Commissioners approved the selection of Malcolm Pirnie as the number <br />one ranked consultant for the above -referenced project. (See attached <br />Commission minutes and agenda item.) The Utilities Department has now <br />completed negotiations with Malcolm Pirnie for this project. Basic <br />services cover permitting (excluding site plan), design, contract <br />administration and construction inspection for this expansion and the <br />planning and layout of the ultimate buildout of the West Regional <br />Wastewater Treatment Plant. <br />The site planning efforts for this project will be separately <br />negotiated with our wetlands consultant (Masteller and Moler) for <br />project continuity and will be brought to the Commission in the near <br />future for approval. The West Regional Wastewater Treatment Plant is <br />past its 70% capacity level, and with Countryside Mobile Home Park's <br />connection to our system in late June, we must now expand this <br />facility. This expansion due to current capacity is required by the <br />Department of Environmental Protection and is scheduled in our recent <br />Master Plan update. <br />We are now before the Commission seeking approval for the negotiated <br />contract and work authorization with Malcolm Pirnie for the project as <br />stated here and in more detail in both the attached contract and work <br />authorization. <br />ANALYSIS <br />The estimated construction cost is $3,000,000.00 ±. The project is as <br />previously described; however, a more detailed description may be found <br />in Work Authorization No. 1 (see attached). The negotiated <br />compensation for engineering services is as follows: <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.