Laserfiche WebLink
BOOK 90 FACE 92 <br />JUL 27 1993 <br />DATE: <br />JULY 16, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF iITILITY6CES 2; <br />PREPARED TERRY H. DRUM 4P. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: SOLID WASTE FACILITIES FORCE MAIN PROJECT <br />INDIAN RIVER COUNTY BID NO.. 91-113 <br />WORK AUTHORIZATION NO. 16 <br />BACKGROUND <br />On August 6, 1991, the Board of County Commissioners approved the award <br />of the labor contract bid to Driveways, Inc., Bid No. 91-113 (see <br />attached minutes). The Department of Utility Services proposes to use <br />this labor contract to construct approximately 3200 L.F. of 4" P.V.C. <br />force main along the south side of the onsite asphalt entrance road of <br />the solid waste facilities located west of 74th Avenue and south of <br />Oslo Road. <br />This construction will connect the existing landfill leachate pumping <br />station to the landfill regional lift station for transmission to the <br />West Regional Wastewater Treatment Plant. <br />ANALYSIS <br />The project is comprised of the extension of approximately 3200 L.F. of <br />4" force main. The force main is to be extended from the existing <br />onsite manhole at the east of the property to the existing lift station <br />located to the west. <br />The cost of the labor to construct the force main under the labor <br />contract is $12,593.06 (see attached Work Authorization No. 16 with <br />Driveways, Inc.). The pipe and fittings will be supplied by the County <br />at a cost of $6,500.00. In-house engineering, inspection, <br />administrative cost and contingencies are estimated to be $4,250.00. <br />Funding for this project will be from impact fees during construction <br />and reimbursed by the Solid Waste Disposal District (SWDD) upon <br />completion. <br />RECOMMENDATION <br />The staff of The Department of Utility Services recommends that the <br />Board of County Commissioners approve Work Authorization No. 16 to <br />construct the subject project with Driveways, Inc., for the amount <br />of $12,593.06 to extend an estimated 3200 L.F. of force main and <br />authorize expenditure of $10,750.00 for materials and in-house support, <br />and execute the subject agreement for a total project cost of <br />$231343.06. <br />ON MOTION by Commissioner Tippin, SECONDED by <br />Commissioner Macht, the Board unanimously approved <br />Work Authorization No. 16 with Driveways, Inc., as <br />set out in staff's memorandum. <br />SAID WORK AUTHORIZATION <br />IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />56 <br />