My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/2/1993
CBCC
>
Meetings
>
1990's
>
1993
>
11/2/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:55 PM
Creation date
6/16/2015 1:39:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTIVE SUMMARY <br />BOOK 90 FA^E 9P30 <br />In September of 1993 the Indian River County Board of County Commissioners approved <br />a negotiated purchase agreement with General Development Utilities (GDU). The purchase was <br />negotiated by the Indian River County Utility Department. GDU is located in the southeast <br />corner of the County (Figure ES -1) and provides wastewater treatment, effluent reuse, and water <br />distribution facilities for this portion of the County. Water was purchased from the County <br />through a bulk water agreement. <br />In conjunction with the Board approval of the GDU purchase in September, the preparation <br />of an addendum to the adopted Master Plan was also approved. The Board had adopted the <br />comprehensive Water, Wastewater, and Effluent Reuse and Disposal Master Plan in March of <br />1993. The area served by GDU was excluded from the master planning area because wastewater <br />treatment, effluent reuse and water services were already provided. With the purchase of the <br />GDU facilities the County determined that it was necessary to evaluate the impact of adding the <br />additional service area into the long _ term planning for the County's water, wastewater and <br />effluent reuse systems. <br />WATER DISTRIBUTION <br />The evaluation of the water distribution system not only considered the existing GDU water <br />distribution system, but also considered the entire County distribution system with GDU as an <br />element of that system. As was the case with the Master Plan the water distribution system was <br />evaluated to identify immediate improvements necessary to bring the system up to County <br />standards, and improvements necessary to meet future flow conditions (Year 2010). The water <br />demand projections developed in the adopted Master Plan were used for this evaluation; however, <br />the existing water demands were calibrated using actual water use records for GDU. <br />The following modifications to the water distribution system are required based upon the <br />analysis of the system: <br />Immediate Needs <br />1. Replace 6 -inch pipe with 8 -inch pipe in the Garden Grove development in the cul & <br />sac of 6th Avenue. This is required to meet max day flow plus fire flow conditions. <br />Future Needs <br />2. Install a distribution main on the north GDU boundary. This project was previously <br />identified in the adopted Master Plan and will be triggered by growth North of GDU. <br />W.\7763\REP0RT4D[ CSUMM ES -1 <br />38 <br />November 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.