My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/2/1993
CBCC
>
Meetings
>
1990's
>
1993
>
11/2/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:55 PM
Creation date
6/16/2015 1:39:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov 2 1993 <br />Boor 99 F -Dr 934, <br />Executive Summary BROWN AND C A L D W E L L <br />EFFLUENT REUSE <br />The adopted Master Plan recommends a County -wide reuse network consisting of a muse <br />force main which would loop around the County to collect effluent from WWTPs and deliver <br />effluent to muse sites. The force main path was selected to take advantage of as many muse <br />options as possible. All four regional WWTPs to the west of the Indian River <br />(North Region, <br />Central Region, West Region, and South Region) would discharge effluent into the reuse <br />network. The proposed interconnected muse system would provide the County with a high <br />degree of flexibility and' reliability. <br />The addition of GDU to the South Region has very little impact on the County -wide reuse <br />network because the increase in total effluent flow into the network will be minor. On the other <br />hand, the recommendation to use the GDU WWTP as the Regional WWTP will require the <br />addition of effluent force main from the GDU WWTP to the reuse loop. The estimated cost of <br />this project is $902,000. The effluent force main from the previously <br />the reuse loop would not be necessary,p y proposed WWTP site to <br />Therefore, the overall effluent reuse costs have been increased an mated estimated $842,000. n in cost of $60,000. <br />SUMMARY <br />The effect of the County expanding the South Region service area in terms of capital <br />projects and cost are as follows: <br />I. Water Distribution ($ 843,000) <br />2. Wastewater Collection $3,240,000 <br />3. Wastewater Treatment ($2,400,000) <br />4. Effluent Reuse 1 842,000 <br />Net Change ($ 839,000) <br />By the County purchasing and expanding the South Regional service area they will be able <br />to serve a larger number of customers with a minimal additional capital cost outlay: This is <br />primarily due to purchasing an existing system and taking advantage of capacity and This <br />already available. <br />W 17763\REP0Rr,McECSUMM ES -6 <br />1 <br />42 <br />Novemba 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.