My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/9/1993
CBCC
>
Meetings
>
1990's
>
1993
>
11/9/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:55 PM
Creation date
6/16/2015 1:41:56 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/09/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OV - 91993 <br />BOOK 9® F'AuF 973 -7 <br />generated by the proposed use were then assigned to roadways on the <br />network. <br />Capacities for all roadway segments in Indian River County are <br />calculated and updated annually, utilizing the latest and best <br />available peak season traffic characteristics and applying Appendix <br />G methodology as set forth in the Florida Department of <br />Transportation Level of Service Manual. Available capacity is the <br />total capacity less existing and committed traffic volumes; this is <br />updated daily based upon vesting associated with project approvals. <br />The traffic capacity for the segment of 58th Avenue affected by <br />traffic from this site is 830 trips (peak hour/peak season/peak <br />direction) at a Level of Service "D", while the existing traffic <br />volume on this segment of 58th Avenue is 523 trips (peak hour/peak <br />season/peak direction). The additional 5 peak hour/peak <br />season/peak direction trips created by the most intense use of the <br />subject property under the proposed zoning classification will <br />increase the total peak hour/peak season/peak direction trips for <br />this segment of 58th Avenue to approximately 528. <br />Based on staff analysis, it was determined that 58th Avenue and all <br />other impacted roads can accommodate the additional trips without <br />decreasing their existing levels of service. Impacted roads are <br />defined in the county's Land Development Regulations as roadway <br />segments which receive five percent (5%) or more daily project <br />traffic or fifty (50) or more daily project trips, whichever is <br />less. <br />The table below identifies each of the impacted roadway segments <br />associated with this proposed zoning classification. As indicated <br />in this table, there is sufficient capacity in all of the segments <br />to accommodate the projected traffic associated with the request. <br />TRAFFIC CONCURRENCY DETERMINATION <br />Impacted Road Segments <br />(peak hour/peak season/peak direction) <br />Existina Demand Total Available Positive <br />Roadway Existing Vested Segment Segment Project Concurrency <br />Segment Volume Volume Demand Capacity Demand Determination <br />1930 1040 511 <br />3025 474 221 <br />3030 523 113 <br />- Water <br />1551 1099 1 <br />695 135 1 <br />636 194 4 <br />Y <br />Y <br />Y <br />The site is within the urban service area; however, water lines do <br />not extend to the site at this time. <br />Using the subject property for 9 residential units will result in <br />water consumption at a rate of 9 Equivalent Residential Units <br />(ERU), or 2,250 gallons/day. This is based upon a level of service <br />of 250 gallons/ERU/day. If the subject property were to connect to <br />county lines, it would be serviced by the North County Water Plant <br />which is currently under construction. This plant will have a <br />28 <br />Segment <br />Roadway <br />Capacity <br />Segment <br />Road <br />From <br />To <br />LOS "D" <br />1930 <br />S.R. 60 <br />58th Avenue <br />43rd Avenue <br />2,650 <br />3025 <br />58th Avenue <br />16th Street <br />S.R. 60 <br />830 <br />3030 <br />58th Avenue <br />S.R. 60 <br />41st. Street <br />830 <br />Existina Demand Total Available Positive <br />Roadway Existing Vested Segment Segment Project Concurrency <br />Segment Volume Volume Demand Capacity Demand Determination <br />1930 1040 511 <br />3025 474 221 <br />3030 523 113 <br />- Water <br />1551 1099 1 <br />695 135 1 <br />636 194 4 <br />Y <br />Y <br />Y <br />The site is within the urban service area; however, water lines do <br />not extend to the site at this time. <br />Using the subject property for 9 residential units will result in <br />water consumption at a rate of 9 Equivalent Residential Units <br />(ERU), or 2,250 gallons/day. This is based upon a level of service <br />of 250 gallons/ERU/day. If the subject property were to connect to <br />county lines, it would be serviced by the North County Water Plant <br />which is currently under construction. This plant will have a <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.