My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/23/1993
CBCC
>
Meetings
>
1990's
>
1993
>
11/23/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:56 PM
Creation date
6/16/2015 1:34:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/23/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Macht, SECONDED by <br />Commissioner Tippin, the Board unanimously approved <br />payment of $2,870 to American Coastal Engineering <br />representing 50 percent of payment for Task 1, as <br />recommended by staff. <br />ROUND ISLAND PARR IMPROVEMENTS - CHANGE ORDER #2 <br />The Board reviewed memo from Capital Projects Manager Terry <br />Thompson dated November 16, 1993: <br />TO: <br />THROUGH: <br />FROM: <br />a SUBJECT: <br />DATE: <br />James E. Chandler, <br />County Administrator <br />James W. Davis, P.E., <br />Public Works Director + ell <br />Terry B. Thompson, P.E.�j <br />Capital Projects Manager <br />Round Island Park Improvements <br />Change Order No. 2 <br />November 16, 1993 FILE: RICO2.AQN <br />DESCRIPTION AND CONDITIONS <br />The Contractor for Round Island Park Improvements, Speegle <br />Construction, has encountered muck while excavating for the boat <br />ramps. This material must be removed in order to achieve proper <br />compaction of the subgrade under the boat ramps. Staff has <br />negotiated a price of $5 per cubic yard to remove 180 cubic yards <br />for a total of $900. <br />During the installation of the drainfield for the septic tank, the <br />Environmental Health Department required the Contractor to install <br />an additional 156 square feet of drainfield. Using the contract <br />unit price of $2 per square foot for drainfield the amount due the <br />Contractor for this work is $312. In addition, the Contractor <br />incurred an expense of $45 to place sand around the septic tank and <br />drainfield. <br />In order to deter vandalism in the new restrooms, staff would like <br />to install flush valves that are concealed behind the walls. The <br />additional cost of a concealed flush valve for the urinal is <br />$353.09. <br />The total increase in the contract amount for the attached Change <br />Order No. 2 is $1,610.09. This Change Order also provides for an <br />18 day time extension due to rain delays and delays in the delivery <br />of fill that was provided by the County. <br />3:1 <br />qq� <br />BOOK 91 u 85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.