My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/7/1993
CBCC
>
Meetings
>
1990's
>
1993
>
12/7/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:56 PM
Creation date
6/16/2015 1:35:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/07/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P.E., <br />Public Works Director <br />FROM: Terry B. Thompson, P.E. JK <br />_Capital Projects Manager <br />_ SUBJECT: 41st Street and 45th Street from Indian <br />River Boulevard to US1 <br />DATE: November 29, 1993 FILE: GRWRK01M.A(M <br />DESCRIPTION AND CONDITIONS <br />The County has been negotiating with property owners on 41st Street <br />and 45th Street between Indian River Boulevard and US1 to purchase <br />needed right-of-way. As a result of the negotiations, <br />modifications need to be made to the construction plans for 41st <br />Street and 45th Street. These modifications include removal of <br />trees, construction of grove roads and ditches, installation of <br />flashboard risers and redesign of drainage structures on 41st <br />Street to accomodate flow through drainage from west of US1. <br />The attached Work Order No. 3 from Glace & Radcliff, Inc. provides <br />for making the needed revisions to the construction drawings at a <br />cost not to exceed $8,406. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that the County execute the attached agreement <br />with Glace & Radcliff, Inc. Funding is from account 309-215-541- <br />033.13, Indian River Boulevard Phase IV. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously approved <br />Work Order No. 3 with Glace & Radcliff, Inc., as set <br />out in the above staff recommendation. <br />WORK ORDER NO. 3 IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />88 <br />DEC ® 7 1993 <br />L_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.