Laserfiche WebLink
(3) Private land clearing debris burning facilities (special <br />=xception) <br />(a) Districts requiring special exception approval (pursuant to <br />_the provisions of 971.05): A -l; A-2, A-3. <br />(b) Additional information requirements: A site plan meeting all <br />the_reldirements of Chapter 914,.which shbwsj _ The location <br />and specification -of all screening materials;:thb location and <br />designation of all thoroughfate roads whith setvethe site; <br />and occupied structures within five hundred (500) feet of the <br />burn area,, the'locatioh bf proposed stockpiles and the burn <br />area; and all rectuired setbacks. <br />(c) Criteria for land clearing debris burning facilities: <br />02i�­ <br />There, shall be;, at minimum, a five hundred -foot <br />sbpardtiofi distancd between the bush dtea of the facility <br />and any oceupied:.sttuctukd in existeftce at the tithe of <br />the site plahapplication. <br />Theuse shall be limited to property with an AG -1 AG -2, <br />mor AG -1 land use plan do8ighatibi <br />3, The.facility.shall have directaccess.to a thoroughfare <br />plah.w fbad; oi` dirbct access to a ` tionthc�f}tiughfate pian <br />road ` that" ,has . a"traffic Volutfie of lest ;I -E ah. fbkty <br />ttips ends'pe-f day. <br />4. No_debris.-storage or burn,,. area shall berwithin.three <br />_hdhdred ( 300 ) feet of .ahy property 11h6. <br />5. - Prior to site plan release the applicant must provide the <br />L <br />ty d edpy of the appropriate f"iorida bepartrtle�tt of <br />oval or letter of no objectiofi f�titn 'VbDt� £for theosed btoject. <br />6. The facility must be approved by the Indian River County <br />solid Waste bisposal District (sWob)board. <br />A Type "A" buffer must be provided on all boundaries <br />abutting residentially used or tesidehtially designated <br />aroberty. <br />The volume of stockpiled land clearing debris on site <br />shall hot exceed the thitty-day bush Volume capacity of <br />the-incineratbr, Thb site pian application shall show <br />how the Volume of all stockpile areas.,oti the site 'shall <br />be-lifttited to the thirty -day burn volume capacity of the <br />incinerator. <br />If any, of the debris hauling route(s) associated with <br />facility operation is over county maintained, unpaved <br />roads, the applicant must maintain that 'section of the <br />hauling route during the debris hauling activity, and <br />security for this purpose may be required as determined <br />by the couhty engiheer,:The provisions of section 934.09 <br />of the county excavation and Mining ordinance shall apply <br />to debris hauling activities associated with debris <br />bufning facilities, in the same way said provisiohs apply <br />to excavated m6 torial hauling activities associated with <br />mining oberations. <br />locked-ou <br />