Laserfiche WebLink
r JAN 11199 <br />BOOK 91 NAr,E 0r1 ��,13 <br />TO: <br />%%MU H: <br />FROM: <br />SUBJECT: <br />James Chandler <br />County Administrator <br />James W. Davis, P. <br />Public Works Direc <br />Roger D. Cain, P.E <br />County Engineer <br />43RD Ave. Bridge R <br />Change Order No. 1 <br />DATE: January 4, 1994 <br />DESCRIPTION AND CONDITIONS <br />oject 8940 <br />It is necessary to bring this change order to the Board for <br />approval to formalize a prior reduction in the contract brought on <br />by allowing the use of stay -in-place forms and for an increase to <br />provide for reinforcing bar extensions for the approach slab. It <br />was decided that the bar grip couplers was the most effective way <br />to extend the reinforcing into the next phase's concrete pour and <br />allow for the reinforcing. Because the existing bridge curbing <br />interfered with the extension of the approach slab reinforcing bar, <br />it was impossible to extend the bars along a portion of the <br />existing bridge. <br />ALTERNATIVES AND ANALYSIS <br />As this change must be accomplished to build the bridge, no <br />alternatives are presented. <br />RECOMMENDATION AND FUNDING <br />Staff recommends the Board approve Change Order No. 1 to this <br />contract decreasing the contract amount by $4,213.38 and by 28 <br />calendar days, from $795,682.80 to $791,469.42, and authorize the <br />Chairman to execute it on behalf of the Board. <br />ON MOTION by Commissioner Macht, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />Change Order No. 1 with Murphy Construction Co. <br />decreasing the contract amount by $4,213.38 and by <br />28 calendar days, as set out in the above staff <br />recommendation. <br />CHANGE ORDER NO. 1 IS ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />60 <br />