My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/18/1994
CBCC
>
Meetings
>
1990's
>
1994
>
1/18/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:23 PM
Creation date
6/16/2015 1:41:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/18/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r JAN 18 19,94 <br />BOOK 91 PAGE 539 <br />Director Davis explained that the length of the project is 25 <br />feet plus 166 feet plus 45 feet which computes to 236 feet. <br />Mr. Kirrie agreed that is the length of the project, but he <br />pointed out that the preliminary assessment for 166 feet plus was <br />calculated by assessing from the point that begins at the face of <br />the property. <br />Director Davis explained that in 1988 Mr. Kirrie's assessment <br />was calculated on the length of frontage (420 feet) times $30.00 <br />times 3.75, which was his fair share of the assessment because he <br />had only one side of the road. What complicates the matter is <br />that Mr. Kirrie is paying for both sides of the street now and he <br />is requesting us to apply his escrow amount of $4,275 to a project <br />of $9,139 in total costs. In addition, Mr. Kirrie is asking us to <br />extend the pavement 26 feet further to his second driveway for <br />which he is willing to pay an additional $836. The'total cost to <br />Mr. Kirrie would be $5,143. <br />PRELIMINARY COST ESTIMATE FOR <br />128TH COURT (236 L.F. NW OF 79TH AVENUE) <br />PROJECT 9121 <br />TOTAL T..F. 236 <br />TOTAL F.F. 332 <br />1, ENGINEERING $611.24 <br />Based on $2.59/LF <br />2. CONSTRUCTION $7,764.90 <br />SUB -TOTAL $8,376.14 <br />3. ADMINISTRATION $252.54 <br />3.0149926% OF <br />ENGINEERING <br />& CONSTRUCTION <br />4. 2% TAX COLLECTORS <br />FEE (ENGINEERING $167.52 <br />& CONSTRUCTION) <br />5. PERMIT FEES $300.0 <br />6. RECORDING FEE $43.50 <br />SUB -TOTAL .$9,139.70 ` <br />TOTAL COST OF PROJECT $9,139.70 <br />$9,139.70 + 236 L.F. $38.7275 L.F. <br />$38.7275 x 191 L.F. — $7,396.96 z.75 a $5,547.72 + 332 $16.71 F.F. <br />$38.7275 x 45 I -F. — $1,742.74 x.75 m 51,307.060 <br />• <br />This addidand cost to be paid by Mr. Rime <br />75% To Be Paid by Pmparly Owners $6,854.78 <br />25% To Be Paid by County $2,284.92 <br />17 -Ian -94 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.