FP"_ <br />FEB 2 2 114 <br />BOOK <br />Item #4 Concrete beam in North Stair had to be <br />modified to allow for sufficient head room <br />in the stair. (ARCHITECT) <br />Item #5 Plaster soffit at Sallyport entry was <br />added to conceal overhead plumbing lines. <br />(ARCHITECT) <br />Item #6 Wood species for the Courtroom seating was <br />changed to the finished product would be <br />more compatible with the wood wall paneling. <br />(ARCHITECT) <br />91 PAGE 778 <br />4,658.00 <br />1,728.00 <br />9,111.00 <br />Item #7 Hardware changes based upon final review of 7,347.00 <br />the security and hardware requirements for <br />the project. (ARCHITECT) <br />Item #8 Additional reinforcement steel and thickened 1,008.00 <br />roof slab to accommodate roof -top screen wall. <br />(ARCHITECT) <br />Item #9 <br />Add exhaust fan. Remove internal insulation <br />14,803.00 <br />and add external insulation to Air Handling <br />Units. (INDOOR AIR QUALITY CONSULTANT) <br />Item #10 <br />Masonry privacy walls and stainless steel <br />5,425.00 <br />benches omitted from some holding cells. <br />(ARCHITECT) <br />Item #11 <br />Thru-wall flashing under coping cap was <br />2,162.00 <br />omitted from the documents. (ARCHITECT) <br />Item #12 <br />Notching of window mullions required due to <br />2,290.00 <br />interference with floor slab. (ARCHITECT) <br />Item #13 <br />Concrete footing for planter walls was <br />2,468.00 <br />omitted from documents. (ARCHITECT) <br />Item #14 <br />GWB bulkheads at changes in ceiling <br />618.00 <br />elevations were omitted from documents. <br />(ARCHITECTS) <br />Item #15 <br />Wood furring around corridor windows on <br />2,891.00 <br />2nd and 3rd floors was omitted from <br />contract documents. (ARCHITECT) <br />Item #16 <br />Add louver to roof -top fan room as <br />1,710.00 <br />required for smoke exhaust system. <br />(ARCHITECT) <br />Item #17 <br />Handi-cap toilets were scheduled for <br />-0- <br />certain non handi-cap toilets. (ARCHITECT) <br />Item #18 <br />Change floor mounted water closet to wall <br />526.00 <br />mounted due to interference with structural <br />floor framing system. (ARCHITECT) <br />Item #19 <br />Flush floor mounted floor junction boxes <br />299.00 <br />were omitted from contract documents. <br />(ARCHITECT) <br />Item #20 <br />Relocate rain leader and enclose as <br />990.00 <br />required by code. (ARCHITECT) <br />TOTAL OF CHANGE ORDER NUMBER 8 ............ <br />$109,788.00 <br />10 <br />