My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/1/1994
CBCC
>
Meetings
>
1990's
>
1994
>
3/1/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:23 PM
Creation date
6/16/2015 1:48:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/01/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS <br />The proposed construction is for a water transmission main from County <br />Road 510 south to 49th Street. The estimated construction cost is <br />$1,540,,,000.00 and the project will be designed by in-house engineering. <br />We have negotiated a work authorization with Masteller Moler and Reed, <br />Inc., for surveying services in the amount of $27,310.00. (See <br />attached work authorization.) The construction of this line will not <br />only allow the expansion of the North County Water System but it will <br />also allow several small package water treatment plants to be taken off <br />line. The following package plants will be removed from service: <br />1) Hobart Landing <br />2) Copelands Landing <br />3) Various privately operated MHP treatment facilities <br />The operational cost savings from the removal of these plants is <br />estimated at $20,000.00 per year. This is a result of reduced <br />regulatory testing and man hours to operate these facilities. <br />The staff of the Department of Utility Services recommends approval of <br />the design and construction of this project as outlined and approval of <br />the survey contract as presented. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Macht, the.Board unanimously approved <br />the design and construction- of the water <br />transmission main. on U.S.#1 from CR -510 to 49th <br />Street, and approved the contract with Masteller <br />Moler and Reed, Inc., for surveying services in the <br />amount of $27,310.00, as recommended by staff. <br />SAID CONTRACT <br />IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />SELECTION OF OCCUPATIONAL LICENSE EQUITY STUDY COMMISSION MEMBERS <br />Deferred for one week. <br />LETTER FROM JUDGE L. B. VOCELLE REQUESTING A COURTHOUSE WORKSHOP <br />The Board reviewed the following letter: <br />21 <br />BOX <br />L -MAR ® 1 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.