Laserfiche WebLink
��M <br />ROOK 92 PAGE 66 <br />RECOMMENDATION <br />The Department of Utility Services recommends: (1) approval of -Change <br />Order No. 1, and (2) approval of the payment request of $18,630.11 as <br />payment in full for services rendered. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />Change Order No. 1 with G. E. French Construction <br />and final payment in the amount of $18,630.11, as <br />recommended by staff. <br />CHANGE ORDER NO. 1 IS ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />WATER SERVICE FOR I-951SR-60 COMMERCIAL NOTE, PHASE II, 82ND AVENUE <br />WATER MAIN (FROM OSLO ROAD TO STH STREET) <br />The Board reviewed the following memo dated March 17, 1994: <br />DATE: MARCH 17, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINT <br />DIRECTOR OF UTIL T SERVICES <br />PREPARED ROBERT O. WISEMEN, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: WATER SERVICE FOR I-95/S.R. 60 COMMERCIAL NODE, <br />PHASE II, 82ND AVENUE WATER MAIN (FROM OSLO ROAD <br />TO 8TH STREET) <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -04 -DS <br />BACKGROUND <br />In 1993, the Department of Utility Services successfully constructed <br />a water transmission main along Oslo Road to I-95. The Indian River <br />County water master plan indicated the need for connecting the newly <br />constructed water transmission main to an existing water main at the <br />intersection of 82nd Avenue and 8th Street. This interconnection <br />provides a complete looping of the system, as .well as providing <br />pressure balance and an alternate water source for the <br />Commercial/Industrial Node along the Route 60 corridor. <br />ANALYSIS <br />The interconnection consists of construction of approximately two <br />miles of 16 -inch water main. The construction involves five canal <br />crossings. The preliminary estimated cost of the project is <br />$485,700.00, which includes construction cost,. -as well as surveying, <br />in-house engineering design, permitting, bidding, administration <br />during construction, and inspection. Attached are three surveying <br />proposals with costs: <br />tlMa <br />