My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/7/1994
CBCC
>
Meetings
>
1990's
>
1994
>
4/7/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:24 PM
Creation date
6/16/2015 1:51:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/07/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Construction - To improve maintenance and staff operations <br />at the landfill the District will be constructing a steel <br />and concrete block maintenance, storage and welding building <br />to•replace the existing Pole Barn. The Pole Barn will be <br />removed. Also, a waste oil storage facility will be built <br />to comply with requirements for storage of materials in -a <br />manner to preclude potential groundwater contamination. <br />A new office and major maintenance building has been <br />approved for site plan purposes as well as all of the <br />structures at the landfill. A major site plan approval was <br />required under the County's Planning Ordinance. <br />This new office and maintenance facility will provide office <br />space for District staff; showers, sanitary facilities, and <br />a lunchroom/training area; sanitary facilities for the <br />public, and a major maintenance and repair facility for <br />landfill equipment. <br />H. Land Purchase - The existing borrow pit has been excavated <br />to the point where it will now be closed and converted to a <br />stormwater management facility. In spite of this, however, <br />additional stormwater management areas are required to <br />maximize the use of the landfill area now encompassing 270 <br />acres. <br />To provide additional borrow material for daily and final <br />cover as well as provide additional stormwater management <br />areas the purchase of additional land is necessary. Exhibit <br />VIII provides an illustration of properties, the purchase of <br />which the District may pursue. These properties are <br />currently planned for appraisal through the services of W. <br />H. Benson and Deighan Appraisal. <br />Project manager John Wood began a very lengthy slidefilm <br />presentation of the Recommended Solid Waste Management Master Plan <br />for Indian River County by pointing out several areas of related <br />operations incorporated into the proposed site plan: (THE <br />SOLID WASTE MANAGEMENT MASTER PLAN IS ON FILE IN THE <br />OFFICE OF THE BOARD OF COUNTY COMMISSIONERS) <br />9 <br />APRs. 1994 <br />BOOK 94 ; AGE 84. <br />
The URL can be used to link to this page
Your browser does not support the video tag.