Laserfiche WebLink
MAY J7 1994 <br />,Am. 92 ur,F 441 <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously authorized <br />the Chairman to execute the letter meeting the <br />requirements of the Letter of Credit, as recommended <br />by staff. <br />MASTER PLAN CONSULTANT'S REVIEW OF THE SEA OARS WASTEWATER <br />TREATMENT PLAN CONSTRUCTION OPTIONS <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated May 6, 1994: <br />DATE: MAY 6, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI OICES <br />PREPARED WILLIAM F MICA <br />- AND STAFFED CAPITAL J S ENGINEER <br />BY: DEPAR F UTILITY SERVICES <br />SUBJECT: MASTER CONSULTANT'S REVIEW OF THE SEA OAKS <br />WASTE, TER TREATMENT PLANT CONSTRUCTION OPTIONS <br />BACKGROUND <br />On December 7, 1993 the Indian River County Board of County <br />Commissioners approved evaluation of options related to construction <br />of the Sea Oaks wastewater treatment facility. (See attached copy <br />of agenda item and minutes.) The options considered were as <br />follows: <br />1. Construction of the expansion of Sea Oaks to 0.85 million <br />gallons a day with associated infrastructure. ,. <br />2. Transmission of the North Beach sewer flows across the Indian <br />River to the North County Wastewater Treatment Plant. <br />3. Transmission of the North Beach sewer flows to the City of Vero <br />Beach. <br />For details of this evaluation, see the copy of the report prepared <br />by Brown and Caldwell, which is on file in the Commission office. <br />ANALYSIS <br />The Brown and Caldwell report ranks the three options based on a <br />present worth analysis in table 1 of the report. (see attached) The <br />option of pumping the North Beach flows to the North County <br />Wastewater Treatment Plant or option 2 is the preferred option. We <br />are now before the Board of County Commissioners to request <br />acceptance of this study as an addendum to the Utilities Master <br />Plan. By acceptance of this report, we are also requesting <br />authorization to negotiate a contract with our short-listed <br />wastewater force main design consultant. -This contract will be for <br />design and construction of a regional repump lift station on the <br />beach and all associated conveyance systems to the North County <br />Wastewater Treatment Plant. <br />36 <br />