Laserfiche WebLink
design, and obtain the associated permits, (including COUNTY Right -of -Way permit) for the <br />improvements to 17th Street SW as a two lane roadway from the east property line of the school <br />site to 27th Avenue including the following turn lane improvements at the intersection of 17th <br />Street SW and 27th Avenue: <br />• Southbound right tum lane <br />• Southbound left turn lane <br />• Northbound left turn lane <br />• Eastbound left turn lane <br />The DEVELOPER shall be responsible for the design, permitting of a modified span wire traffic <br />signal system and associated improvements at the intersection of 17th Street SW and 27th <br />Avenue to accommodate the required lanes and turning movements. Priorto the issuance of the <br />Project's 3$8t" Certificate of Occupancy or December 31, 2017, whichever occurs first, the <br />DEVELOPER shall complete the roadway and intersection construction in a manner approved by <br />the Public Works Director for acceptance by the COUNTY. <br />In the event the County has not obtained sufficient right-of-way for the DEVELOPER to <br />complete the 17th Street SW Improvements, then DEVELOPER shall pay to the COUNTY the <br />cost to complete the 17th Street SUV Improvements and the DEVELOPER shall have no further <br />obligations with respect to such improvements.. <br />If a certificate of occupancy milestone or timing obligation is missed by the DEVELOPER, <br />the COUNTY shall cease issuing certificates of occupancy and building permits to DEVELOPER <br />until such time the milestone or timing obligation is met, unless the Public Works Director <br />determines the DEVELOPER is making satisfactory progress with construction. <br />[The remainder of this page is intentionally left blank] <br />