My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-046
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:16:30 PM
Creation date
3/7/2018 2:47:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
03/06/2018
Control Number
2018-046
Agenda Item Number
8.N.
Entity Name
Blue Goose Construction
Subject
Water Sewer and Reclaimed Water Line Replacement
Area
22nd Street SW
Bid Number
Work Directive 2018-002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2018-002 <br />42422 "d Street SE Sewer Lateral Replacement <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: February 20, 2018 <br />ATTACHMENT 2 <br />EFFECTIVE DATE: March 6, 2018 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014 <br />PROJECT: 424 22nd Street SE Sewer Lateral Replacement <br />0 <br />COUNTY UTILITY PROJECT NO.: UCP #N/A CONTRACTOR'S PROJECT NO.: N/A -P <br />COUNTY WIP. No. 471-169000-18515 9 <br />U <br />You are directed to proceed promptly with the following work: b <br />ro <br />Construct new sanitary sewer service including sewer tap, lateral piping, cleanouts, abandon existing <br />failed service, cut & repair paved roadway, and restoration. <br />Method of determining Contract Price: <br />X-) Unit Prices: Bid Items as established pursuant to Bid No <br />2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />❑ Lump Sum <br />❑ Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost (rounded) = <br />$15,000.56 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />ACCEPTED: <br />By: 4 <br />Blue Goose onstruction <br />Labor Contractor <br />Date: <br />RECOMMENDED: <br />Jnowu <br />.Me ".. <br />By: "d- � <br />ohn M. Boyer, .F,' ' <br />Utilities Engineer:; <br />Date: <br />AND LEGAL SU1=101 <br />is <br />DYLAN REINGOLD <br />COUNTY ATTORNEY <br />F:\Utilities\UTILITY - Engineering\Projects - Capital Projects\18-0213 424 22nd St SW\Agenda Item\BGC WA 2018-002.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.