Laserfiche WebLink
is <br />SECTION 00800 - SUPPLEMENTARY CONDITIONS <br />TO THE GENERAL CONDITIONS <br />Article Title <br />Article Number <br />Introduction <br />SC —1.00=' <br />Defined Terms <br />SC —1.01' <br />r<: <br />Terminology <br />SC —1.02 <br />Before Starting Construction <br />SC -2.05 <br />Preconstruction Conference <br />SC — 2,06 <br />�t <br />Coordination of Plans, Specifications, and Special Provisions <br />SC — 3.06 <br />Subsurface and Physical Conditions <br />SC — 4.02 <br />Performance, Payment and Other Bonds <br />SC — 5.01 <br />Certificates of Insurance <br />SC — 5.03 <br />_...... ....... .. . <br />CONTRACTOR's Liability Insurance <br />SC - 5.04 <br />OWNER's Liability Insurance <br />SC — 5.05 <br />Property Insurance <br />SC - 5.06 <br />t <br />Waiver of Rights <br />SC — 5.07 <br />Receipt and Application of Insurance Proceeds <br />SC — 5.08 <br />Acceptance of Bonds and Insurance; Option to Replace <br />SC — 5.09 <br />i <br />i <br />Labor; Working Hours <br />SC"— 6.02 <br />Concerning Subcontractors, Suppliers and Others <br />SC — 6.06 <br />Permits <br />SC — 6.08 <br />i <br />Cost of the Work <br />SC —11.01 <br />. <br />1 <br />i <br />t <br />Test and Inspections <br />- <br />SC —13.03 <br />I <br />c <br />OWNER May Stop the Work <br />SC —13.05 <br />i <br />Correction Period <br />SC —13.07 <br />Progress Payments <br />SC -14.02 <br />Substantial Completion <br />SC —14.04 <br />00800-1 <br />00800: <br />Supplementary conditions 05-13 rev. <br />00800 IF:\Public WorkkNGINEERING DIVISION PROJECTS%17361RC Health.Departmenl Roof Replacement Projed11-Admin\Bid Documents%Master contract <br />Oocuments100600 - Supplemerilary Cond(tlans 0513 rev. doe <br />i <br />