My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-' <br />r:< <br />C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will <br />deliver to Owner and Contractor a written recommendation as to division of responsibilities <br />pending final payment between Owner and. Contractor with respect to security, operation, C` <br />safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and <br />guarantees <br />SC714.07 Final Payment <br />SG14.07.C.1. Delete paragraph GC -14.07.C. in its entirety and insert the following <br />paragraph in its place: <br />�z <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the" Local <br />Government Prompt Payment Act" , Florida Statutes section 218.70, et..seq. <br />SC -15.01 OWNER May Suspend Work <br />SC -15.01.A Delete the last sentence in paragraph GC -15.01.A and insert the following in its <br />place: <br />CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br />such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br />10.05.. CONTRACTOR shall not be allowed an ' adjustment of the Contract Price and i <br />CONTRACTOR shall nofbe paid on account of loss of- icipated profits or revenue or other eco- <br />nomic loss arising out of or resulting from such Work suspension. <br />SC -15.02 OWNER May Terminate For Cause ` <br />SC -15.02.A.5 and SC -15.02.A.6 Add the following new paragraphs immediately after <br />paragraph GC -15.02.A.4: <br />5. CONTRACTOR's violation of Section 02225 — "Erosion Control and Treatment of <br />Dewatering Water From the Construction Site." <br />6. CONTRACTOR's failure to make payment to Subcontractors or Suppliers for <br />materials or labor in accordance with the respective agreements between the <br />CONTRACTOR and the Subcontractors or Suppliers. <br />SC45.04 CONTRACTOR May Stop Work or Terminate <br />SC -15.04 Delete the following text from the first sentence of paragraph GC-15.04.A:OF GWNER fh-ils- fOr 2-0- cd-mys to pay CONTRAGTOR any sum finally determined to be due, <br />I <br />i <br />SCA 5.04 Delete the following text from the second sentence of paragraph GC -15.04.A: <br />failed feF 30 days pay GONTRAGTGR aRy sum finally deteFiTlined to be <br />due; <br />00800-10 <br />00800 - Supplementary, Conditions 05-13 rev <br />00800 10P:1Public Works%ENGINEERING DIVISION PROJECTSM36 IRC Health Department Roof Replacement ProJed11-Adrhm%.8 d DocumenlsWaster Contrail <br />Documents100800 - Supplementary Conditions 0513 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.