Laserfiche WebLink
DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: IRC HEALTH DEPARTMENT ROOF REPLACEMENT AND EXTERIOR REPAIR <br />PROJECT <br />OWNER's Project No. IRC -1736 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change, has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />0 Unit Prices Q Contractor's Records <br />0 Lump Sum 0 Engineer's Records <br />Other. 0 Other: <br />— <br />0 By Change Order: 0 By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change. Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated if the change involves an increase, the estimated <br />amount is not to be . exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: RECOMMENDED: .1 J APPROVED: <br />By: By: By: <br />CONTRACTOR (Signature) ENGINEER (Signature) OWNER (Signature) <br />Date: Date: Date: <br />* * END OF SECTION <br />PAPublic WorksTNGINEERING DIVISION PROJECTSM736 IRC Health. Department Roof Replacement ProJect\1-AdminlBid <br />-2013.doc <br />DocumentsWiaster Contract Documents\00948 - Work Change Directive: Rev 06 <br />.... .. <br />..... <br />SECTION. 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: IRC HEALTH DEPARTMENT ROOF REPLACEMENT AND EXTERIOR REPAIR <br />PROJECT <br />OWNER's Project No. IRC -1736 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change, has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />0 Unit Prices Q Contractor's Records <br />0 Lump Sum 0 Engineer's Records <br />Other. 0 Other: <br />— <br />0 By Change Order: 0 By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change. Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated if the change involves an increase, the estimated <br />amount is not to be . exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: RECOMMENDED: .1 J APPROVED: <br />By: By: By: <br />CONTRACTOR (Signature) ENGINEER (Signature) OWNER (Signature) <br />Date: Date: Date: <br />* * END OF SECTION <br />PAPublic WorksTNGINEERING DIVISION PROJECTSM736 IRC Health. Department Roof Replacement ProJect\1-AdminlBid <br />-2013.doc <br />DocumentsWiaster Contract Documents\00948 - Work Change Directive: Rev 06 <br />