My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: IRC HEALTH DEPARTMENT ROOF REPLACEMENT AND EXTERIOR REPAIR <br />PROJECT <br />OWNER's Project No. IRC -1736 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change, has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />0 Unit Prices Q Contractor's Records <br />0 Lump Sum 0 Engineer's Records <br />Other. 0 Other: <br />— <br />0 By Change Order: 0 By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change. Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated if the change involves an increase, the estimated <br />amount is not to be . exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: RECOMMENDED: .1 J APPROVED: <br />By: By: By: <br />CONTRACTOR (Signature) ENGINEER (Signature) OWNER (Signature) <br />Date: Date: Date: <br />* * END OF SECTION <br />PAPublic WorksTNGINEERING DIVISION PROJECTSM736 IRC Health. Department Roof Replacement ProJect\1-AdminlBid <br />-2013.doc <br />DocumentsWiaster Contract Documents\00948 - Work Change Directive: Rev 06 <br />.... .. <br />..... <br />SECTION. 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: IRC HEALTH DEPARTMENT ROOF REPLACEMENT AND EXTERIOR REPAIR <br />PROJECT <br />OWNER's Project No. IRC -1736 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change, has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />0 Unit Prices Q Contractor's Records <br />0 Lump Sum 0 Engineer's Records <br />Other. 0 Other: <br />— <br />0 By Change Order: 0 By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change. Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated if the change involves an increase, the estimated <br />amount is not to be . exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: RECOMMENDED: .1 J APPROVED: <br />By: By: By: <br />CONTRACTOR (Signature) ENGINEER (Signature) OWNER (Signature) <br />Date: Date: Date: <br />* * END OF SECTION <br />PAPublic WorksTNGINEERING DIVISION PROJECTSM736 IRC Health. Department Roof Replacement ProJect\1-AdminlBid <br />-2013.doc <br />DocumentsWiaster Contract Documents\00948 - Work Change Directive: Rev 06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.