My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROGRESS MEETINGS <br />1.1 SCOPE <br />A. Date and Time: <br />1. Regular Meetings: As mutually agreed upon by ENGINEER and <br />CONTRACTOR. <br />2. Other Meetings: On call. <br />B. ' Place: CONTRACTOR'S office at Project site or other mutually agreed upon <br />location. <br />C. .ENGINEER shall prepare agenda, preside at meetings, and prepare and <br />distribute a transcript of proceedings to all parties. <br />D. CONTRACTOR shall provide data required and be.prepared to discuss.all items <br />on agenda. <br />1.2 MINIMUM ATTENDANCE <br />A. CONTRACTOR <br />B. SUBCONTRACTOR: <br />When needed for the discussion of a particular agenda item, CONTRACTOR <br />shall require representatives of Subcontractors or suppliers to attend a meeting. <br />C. CONSTRUCTION COORDINATION MANAGER <br />D. OWNER'S representative, if required. <br />E. Utility Representatives <br />F. Others as appropriate. <br />G. Representatives present for each party shall be authorized to act on their behalf. <br />1.3 AGENDA <br />Agenda will include, but will not necessarily be limited lo, the following: <br />1. Transcript of previous meeting. <br />2: Progress since last meeting. <br />3. Planned progress for next period, <br />4. Problems, conflicts and observations. <br />5. Change Orders. <br />6. Status of Shop Drawings. <br />7. Quality standards and control. <br />8. Schedules, including off-site fabrication and delivery schedules. Corrective <br />measures, if required. <br />9. Coordination between parties. <br />10. Safety concerns. <br />11. Other business. <br />+.+ END OF SECTION + + <br />01220-1 01220 Progress Meetings <br />F:1Pubt1c WorWENGINEERING DIVISION PROJECTS\17361RC Health Department Roof Replacement Projectll-AdminWd DocumentsWasterContract <br />Documents\01220 - Progress Meetings.doc <br />r:.: .:.........:::::: <br />SECTION 01.220 <br />PROGRESS MEETINGS <br />1.1 SCOPE <br />A. Date and Time: <br />1. Regular Meetings: As mutually agreed upon by ENGINEER and <br />CONTRACTOR. <br />2. Other Meetings: On call. <br />B. ' Place: CONTRACTOR'S office at Project site or other mutually agreed upon <br />location. <br />C. .ENGINEER shall prepare agenda, preside at meetings, and prepare and <br />distribute a transcript of proceedings to all parties. <br />D. CONTRACTOR shall provide data required and be.prepared to discuss.all items <br />on agenda. <br />1.2 MINIMUM ATTENDANCE <br />A. CONTRACTOR <br />B. SUBCONTRACTOR: <br />When needed for the discussion of a particular agenda item, CONTRACTOR <br />shall require representatives of Subcontractors or suppliers to attend a meeting. <br />C. CONSTRUCTION COORDINATION MANAGER <br />D. OWNER'S representative, if required. <br />E. Utility Representatives <br />F. Others as appropriate. <br />G. Representatives present for each party shall be authorized to act on their behalf. <br />1.3 AGENDA <br />Agenda will include, but will not necessarily be limited lo, the following: <br />1. Transcript of previous meeting. <br />2: Progress since last meeting. <br />3. Planned progress for next period, <br />4. Problems, conflicts and observations. <br />5. Change Orders. <br />6. Status of Shop Drawings. <br />7. Quality standards and control. <br />8. Schedules, including off-site fabrication and delivery schedules. Corrective <br />measures, if required. <br />9. Coordination between parties. <br />10. Safety concerns. <br />11. Other business. <br />+.+ END OF SECTION + + <br />01220-1 01220 Progress Meetings <br />F:1Pubt1c WorWENGINEERING DIVISION PROJECTS\17361RC Health Department Roof Replacement Projectll-AdminWd DocumentsWasterContract <br />Documents\01220 - Progress Meetings.doc <br />