Laserfiche WebLink
.i _.... _..... _ ----- - - <br />A <br />SECTION 01310 <br />CONSTRUCTION SCHEDULES <br />i <br />t. <br />f <br />1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br />A. After receiving approval by the. ENGINEER, distribute copies of.the <br />approved initial schedule and all reviewed revisions (updated) to: <br />1. Job site file. ° t <br />2. Subcontractors.' <br />3. Other concerned parties. <br />4. OWNER (two copies). <br />5. ENGINEER <br />B. In the cover letter, instruct recipients to report promptly to the <br />CONTRACTOR, in writing, any problems anticipated by the projections <br />shown in the schedules. <br />01310-2 01310 Construction Schedule <br />i <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1736 IRC Health Department Roof Replacement Projechl-Admin\Bid <br />DocumentslMaster Contract Documents\01310 - Construction Schedule.doc i <br />I <br />i <br />t <br />