Laserfiche WebLink
------------ <br />SECTION 01541 <br />i_. <br />PROTECTION OF THE WORK AND PROPERTY <br />1.1 GENERAL <br />A. CONTRACTOR shall. be responsible for taking all precautions, providing all k' <br />programs, and taking all actions necessary to protect the Work and all public <br />and private property and facilities from damage as specified in the General <br />Conditions and herein. f <br />B. In order to prevent damage, injury or loss, CONTRACTOR'S actions shall <br />include, but not be limited to, the following: <br />1. Store apparatus; materials, supplies, and equipment in an orderly, safe <br />manner that will not.undul Interfere with the progress of the Work or the `= <br />Y � p 9 <br />Work.of any other Contractor or utility service company. c_ <br />2. Provide suitable storage facilities for all materials, which are subject to injury G <br />by exposure e to weather, theft, breakage, or otherwise. <br />xp g � <br />3. Place upon the Work or any part thereof, only such loads as are consistent <br />with the safety of that portion of the Work. <br />4. Clean up frequently all refuse, rubbish, scrap materials, and debris caused <br />L <br />by construction operations, so that at all times, the site of the Work presents <br />a safe, orderly, and workmanlike appearance. <br />5. Provide barricades and guard rails around openings, for scaffolding, for. <br />temporary stairs and ramps, around excavations, elevated walkways and <br />other hazardous areas. <br />C. Except after written consent from proper parties, do not enter or occupy <br />privately -owned land with men, tools, materials or equipment, except on <br />easements provided herein. <br />D. Assume full responsibility for the preservation of all public and private property or <br />facility on or adjacent to the site. If any direct or indirect damage is done by or <br />on account of any act, omission, neglect or misconduct in the execution of the <br />Work by the CONTRACTOR, it shall be restored by the CONTRACTOR, at its <br />expense, to a condition equal to or better than that existing before the damage <br />was done. <br />1.2 BARRICADES AND WARNING SIGNALS <br />CONTRACTOR's responsibility for the maintenance of barricades, signs, lights, and <br />for providing watchmen shall continue until OWNER accepts the Project. <br />1.3 TREE AND PLANT PROTECTION <br />01541-1 F:\Public WorWENGINEERING DIVISION <br />PROJECTS\1736 IRC Health Department Roof Replacement Project\1-Adm1n\5id Documents\Master Contract Documents\01541 - <br />Protection of.Property.doc <br />