My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01770 <br />CLOSEOUT PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, . including General and <br />Supplementary Conditions and other Division 1 Specification Sections, apply to <br />this Section. <br />1.2 SUMMARY <br />A. This Section includes administrative and procedural requirements for contract <br />closeout, including, but not limited to, the following: <br />1. . Inspection procedures. <br />2. Warranties. <br />3. Final cleaning. <br />B. Related Sections include the following: <br />1. Division 1 Section "Payment Procedures" for requirements for Applications <br />for Payment for Substantial and Final Completion. <br />2. Divisions 2 through 16 Sections for specific closeout and special cleaning <br />requirements for the Work in those Sections. <br />1.3 SUBSTANTIAL COMPLETION <br />A. Preliminary Procedures: Before requesting inspection for determining date of <br />Substantial Completion, complete the following List items below that are <br />incomplete in request. <br />1. Prepare a list of items to be completed and corrected (punch list), the value <br />of items on the list, and reasons why the Work is not complete. <br />2. Advise Owner of pending insurance changeover requirements. <br />3. Advise Owner of changeover in heat and other utilities. I <br />4. Submit changeover information related to Owner's occupancy, use, <br />operation, and maintenance. <br />5. Complete final cleaning requirements, including touchup painting. <br />6. • Touch up and otherwise repair and restore marred exposed finishes to <br />eliminate visual defects. <br />B. Inspection: Submit a written request for inspection for Substantial Completion.. On <br />receipt of request, Architect will either proceed with inspection or notify Contractor <br />of unfulfilled requirements. Architect will prepare the Certificate of Substantial <br />01710 Site Cleanup <br />01770-1 <br />FAPublic WorWENGINEERING.DMSION PROJECTS\1736 IRC _Health Department Roof Replacement Prof eG\1-Admin\Bid DocumentsWtaster <br />Contract Documents\01770- Closeout Procedures.doc <br />