Laserfiche WebLink
�.. <br />SECTION 00 65.36 <br />CONTRACTOR'S 20 -YEAR WARRANTY <br />Know all men by these presents, that we, (Contractor) <br />having installed roofing system, flashings and sheet metal on the Indian River County Health Department <br />Roof Replacement & Exterior Repair Project under contract between Indian River County (Owner) and <br />Contractor, warrant to the Owner with respect to said work that for a period of twenty (20) years from . <br />date of final completion, the work shall be absolutely watertight and free from any and all leaks, provided <br />however the following are excluded from this Warranty: <br />a. Defects or failures resulting from abuse by the Owner. <br />b. Defect in. design involving failure of (1) structural frame, (2) load <br />bearing walls, and (3) foundations. <br />C. Damages caused by fire, tornado, hail, hurricane, acts of God, wars, <br />vandalism, riots or civil commotion. , <br />We, Contractor, agree that should any leaks occur in the work we will perform emergency repairs.within <br />24 hours notice and perform permanent repairs within a reasonable time in a manner to restore the workto <br />a watertight condition by methods compatible to the system and acceptable under industry standards and <br />general practice, all at no expense to the Owner. <br />We, Contractor, further agree that for a period of twenty (20) years from date of final completion referred <br />to above, we will make repairs at no expense to the Owner to any defects which may develop in the work <br />including but not limited to blisters, wrinkles, fish -mouths, ridges, splits and loose flashing in a manner <br />compatible to the system and acceptable under industry standards and general practice as established by the <br />Engineer. <br />Contractor shall attend two post construction field inspections: the first no earlier than twenty three (23) <br />months and no later than twenty-four (24) months after the date of final Completion and the second no <br />earlier than fifty-nine (59) months and no later than sixty (60) months after the date of Final Completion. <br />Contractor shall complete any corrective action requested by Owner, Engineer, or Manufacturer at no <br />additional cost to the Owner. <br />Signature: Title: <br />Stafe <br />County <br />a Notary Public for County, <br />State, do hereby certify that personally appeared before me <br />this day and acknowledged the due execution of the foregoing instrument.' <br />Witness my hand and official seal, this day of • 20 <br />(OFFICIAL SEAL) <br />Notary Public <br />My commission expifes • 20 -- <br />END OF <br />0_.. <br />ENDOF SECTION 00 65 36 <br />Indian River County Health Department <br />Roof Replacement & Exterior Repair 00:65 364 Contractor.'s 20 --Year Warranty <br />