My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 0114 00 <br />WORK RESTRICTIONS <br />GENERAL <br />1.01 SECTION INCLUDES <br />A. Administrative and procedural requirements for work sequence, work restrictions, <br />occupancy requirements and use of premises. <br />1.02 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Specification Sections, apply to this. Section. <br />1.03 WORK SEQUENCE <br />A. The Work shall be conducted in the following sequences unless construction phases are <br />otherwise specified. <br />1. Construct Work in phases to. accommodate the Owner's use; if applicable, of the <br />premises during the construction period-, coordinate the construction schedule <br />and operations with the Owner and Engineer. <br />2. Construct the Work in phases to provide for public convenience. Do not close <br />off public use of facility until completion of one phase of construction will <br />provide alternative usage. <br />3. Construction shall be scheduled in such a manner that once work has commenced <br />on one facility, the Contractor's work force shall remain at that facility <br />continuously*,each work day through final completion at that facility. <br />1.04 WORK RESTRICTIONS <br />A. Work hours (except concrete slab removal) shall generally be performed during normal <br />business hours. Should the Contractor elect to work outside of normal business hours, <br />notification to the Owner and Engineer at least 48 hours in advance shall be required. No <br />work shall be scheduled without prior notification and authorization. . <br />B. All concrete slab removal work shall be performed only on Saturdays and Sundays, <br />unless specifically approved otherwise by the owner. <br />1.05 OCCUPANCY REQUIREMENTS <br />A. Owner Occupancy <br />1. Owner will occupy the premises during the entire period of construction to <br />conduct normal operations. Cooperate with Owner in all construction operations <br />to minimize conflict, and to facilitate Owner usage. <br />2. Contractor shall at all times conduct his operations as to ensure the least <br />inconvenience and the greatest amount of safety and security for the Owner, his <br />staff, and the general public. <br />3. Control noise from operations so that building occupants are not affected. <br />4. Control odors from air intakes so that building occupants are not affected. <br />1.06 USE OF PREMISES <br />Indian River County Health Department <br />Roof Replacement & Exterior Repair <br />011400-1 -W ork Restrictions <br />
The URL can be used to link to this page
Your browser does not support the video tag.