Laserfiche WebLink
wj <br />2. Attendance: Owner, Engineer, Contractor, material manufacturer. <br />3. Minimum Agenda: Walkover inspection; verification of substantial completion; <br />identification of punch list items; identification of problems,.which may impede <br />issuance of warranties. <br />4. - Refer to Section 0177.00. for other requirements. <br />D. Final Inspection Meeting <br />1. Scheduled by Owner and Engineer upon written notification of final completion <br />of work from the Contractor. <br />2. Attendance: Owner, Engineer, Contractor. i <br />3. Minimum Agenda: Verification of final completion including the completion of <br />the punch list items. ` <br />r: <br />4. Refer to Section 0177 00 for other requirements. <br />1.05 REPORTS <br />A. Weekly Construction Reports: 'Prepare a weekly construction report recording the fol- <br />lowing information concerning events at Project site and Fax or email a copy to the Engi- <br />neer by noon on the following Monday: <br />1. <br />Approximate daily count of personnel at Project Site. <br />2. <br />Daily material deliveries. <br />3. <br />Daily High and low temperatures and general weather conditions. <br />4. <br />Accidents. <br />5. <br />Unusual events. <br />6. <br />Stoppages, delays, shortages, and losses. <br />7. <br />Orders and requests of authorities having jurisdiction. <br />8. <br />Change Orders received and implemented. <br />9. <br />Change Directives received and implemented. <br />10.. <br />Daily Allowance and Unit Cost usage. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION 013100 <br />Indian River County Health Department <br />Roof Replacement & Exterior Repair <br />