Laserfiche WebLink
B. Product Data: Collect information into a single submittal for each element of <br />construction and type of product or equipment. <br />1. If information must be specially prepared for submittal because standard printed <br />data are not suitable for use, submit as Shop Drawings, not as Product Data. <br />2. Mark each copy of each submittal to show which products and options are <br />applicable. <br />3. Include the following information, as applicable: <br />a. Manufacturer's written recommendations. <br />b. Manufacturer's product specifications. <br />C. Manufacturer's installation instructions. <br />d. Manufacturer's catalog cuts. <br />e. Printed performance curves., <br />f. Operational range diagrams. <br />g. Compliance with recognized trade association standards. <br />Indian River County Health Department <br />Roof Replacement-& Exterior Repair 0133-00-2 <br />Submittal Procedures <br />Contractor and Subcontractor personnel, and office and mobile numbers of key <br />Owner and REI personnel. <br />2. <br />Work schedule indicating start date, crew size, production rate, completion date, <br />etc. <br />3. <br />Copy of Contractor's Certificate of Insurance <br />4. <br />Copy of Construction Permits <br />5. <br />Roof Manufacturer's Acknowledgement Form (Section 00 62 33) <br />6. <br />Copy of all warranties indicated in Section 0177 00 to meet the requirements of <br />their respective specification section <br />7. <br />Letter describing in detail any proposed changes, substitutions, or deviations <br />from the project or manufacturer's specifications. A written explanation of why <br />substitutions should be considered is required. <br />8. <br />Shop drawings or letter stating that the contractor will install materials as detailed <br />in the Contract Drawings unless properly authorized by the Engineer.. <br />9. <br />Steel Deck Repair/Se6urement (Section 05 3123) <br />10. <br />Rough Carpentry (Section 0610 00) <br />11. <br />Preparation for Reroofing (Section 07 0150) <br />12. <br />Roof Insulation (Section 07 22 16) <br />13. <br />Modified Bitumen Roofing (Section 07 52 16) <br />14. <br />Sheet Metal Flashing and Trim (Section 07 62 00)' . <br />15. <br />Roof Accessories (Section 07 72 00) <br />16. <br />Elastomeric Joint Sealants (Section 07 92 00) <br />17. <br />Elastomeric Coating Restoration (Section 09 0190) <br />18. <br />Storm Drainage (Section 2214 00) <br />19. <br />Existing damaged/dysfunctional components documentation (videotape, photos, <br />etc.) including but not limited to; asphalt spills, windows, walls, sidewalks, <br />paving, ceilings, etc. Lack of submission prior to commencement of work <br />indicates Contractor has discovered no existing damaged components and takes <br />responsibility for any damages caused by operations. <br />20. <br />Complete list of materials with Safety Data Sheets (SDS) <br />PART PRODUCTS <br />2.01 SUBMITTALS <br />A. General: Prepare and submit Submittals required herein and by individual Specification . <br />Sections. <br />B. Product Data: Collect information into a single submittal for each element of <br />construction and type of product or equipment. <br />1. If information must be specially prepared for submittal because standard printed <br />data are not suitable for use, submit as Shop Drawings, not as Product Data. <br />2. Mark each copy of each submittal to show which products and options are <br />applicable. <br />3. Include the following information, as applicable: <br />a. Manufacturer's written recommendations. <br />b. Manufacturer's product specifications. <br />C. Manufacturer's installation instructions. <br />d. Manufacturer's catalog cuts. <br />e. Printed performance curves., <br />f. Operational range diagrams. <br />g. Compliance with recognized trade association standards. <br />Indian River County Health Department <br />Roof Replacement-& Exterior Repair 0133-00-2 <br />Submittal Procedures <br />