My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK: 3097 PG: 2475 <br />PUBLIC CONSTRUCTION BOND <br />Bond No. 80157871 <br />(enter bond number) <br />BY THIS BOND, We Advanced Roofing Inc. 11 as Principal and The a Guarantee <br />COmyany of North America USA, a corporation, as Surety, are bound to Indian River County <br />, herein called Owner, in the sum of $ 509.406.00--, for payment of which we <br />bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and <br />severally. <br />THE CONDITION OF THIS BOND is that if Principal: <br />1. Performs the contract dated February 6, 2018 , between Principal and Owner for <br />construction of **See Below , the contract being <br />made a part of this bond by reference, at the times and in the manner prescribed in the <br />contract; and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly <br />by Principal in the prosecution of the work provided for in the contract; and <br />3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under the <br />contract; and <br />4. Performs the guarantee of all work and materials furnished under the contract for the <br />time specified in the contract, then this bond is void; otherwise it remains in full force. <br />Any action instituted by a claimant under this bond for payment must be in accordance <br />with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance <br />with any formalities connected with the contract or the changes does not affect Surety's <br />obligation under this bond. <br />DATED ON _ February1,2018 <br />Advanced Roofing, Inc. <br />Name of Princi al <br />By <br />(As Attorney in Fact) <br />The Guarantee Company of North America USA <br />BidNumber:2018013, Project Number: LRC -1736, IRC Health Department RoofReptdEie ray}+ r.•fiepdcr i <br />A TRUE COPY D0610 -3 <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />F:1PubIl6wo*a\ENGINEERING DIVISION PROJECTS11736 IRC Health Department Roof Rib' 10 t i� <br />Publlc Construction B <br />DocumentsWaster Contract Documentsl0t)610 - ond.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.