Laserfiche WebLink
t - <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />r-= <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be = <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR. to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within <br />calendar days of the above date of Substantial Completion. <br />The responsibilities between OWNER and CONTRACTOR for security, operation, safety, <br />maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: <br />OWNER: <br />CONTRACTOR: <br />The following documents are attached to and made a part of this Certificate: <br />[For items to be attached see definition of Substantial Completion as supplemented and other specifically <br />noted conditions precedent to achieving Substantial Completion as required by Contract Documents.] <br />This certificate does not constitute an acceptance of Work not in accordance with the Contract <br />Documents nor is it a release. of CONTRACTOR's obligation to complete the Work in <br />accordance with the Contract Documents. <br />Executed by ENGINEER on: (Date). <br />ENGINEER: <br />By: <br />(Authorized Signature) <br />CONTRACTOR accepts this Certificate of Substantial Completion on (date). <br />CONTRACTOR: <br />00630 -,Certificate of substantial completion REV 04=07 <br />00630-2 <br />F\Public WorksIENGINEERING DIVISION PROJECTS\17361RC Health Oepartment Roof Replacement Projecl\1-Admin\Bid Doaiments%lastbr Contract Documents\00630 - <br />Certificate of Substantial Completion REV 04-07.doc <br />i <br />