My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concept of the completed Project as a functioning <br />whole as shown or indicated in the Contract <br />Documents (unless there is a specific statement <br />indicating otherwise). The use of any such term or <br />adjective shall not be effective to assign to ENGI- <br />NEER any duty or authority to supervise or direct <br />the performance of.. the . Work or any duty or <br />authority to undertake responsibility contrary to the <br />provisions of paragraph 9.10 or any other provision <br />of the Contract Documents. <br />B. Day <br />1. The word "day" shall constitute a <br />calendar day of 24 hours measured from <br />midnight to the next midnight. <br />C. Defective <br />1. The word "defective," when modifying <br />the word "Work," refers to Work that is <br />unsatisfactory, faulty, or deficient in that it does <br />not conform to the Contract Documents or does <br />not meet the requirements of any inspection, <br />reference standard, test, or approval referred to <br />In the Contract Documents, or has, been <br />damaged prior to ENGINEER's recom- <br />mendation of final payment (unless responsi- <br />bility for the protection thereof has been <br />assumed by OWNER at Substantial <br />Completion in accordance with paragraph <br />14.04 or 14.05). <br />D. Fumish, Install, Perform, Provide <br />1. The weFd <br />1. "n used in <br />. nent, shall mean to supply and del* <br />1 1 <br />use 9F instalintinn a�d in usable OF epe <br />seadition. <br />2. The ;AVQFd "Install," <br />wfien usedequipment shall mean to put into use eF plaG9 <br />1 <br />ause: � t <br />3. The weFds <br />11 4 OF " " <br />1 <br />when used in GenneGfign with <br />1 ' <br />4. When "furnish; "install," "perform," or <br />"provide" is not used in connection with services, <br />materials, or equipment in a context clearly <br />requiring an obligation of CONTRACTOR, <br />"provide" is implied. <br />E. Unless stated otherwise in the Contract Docu- <br />ments, words or phrases which have a well-known <br />technical or construction industry or trade meaning are <br />used in the Contract Documents in accordance with <br />such recognized meaning. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />2.01 Delivery of Bonds <br />A. When. CONTRACTOR delivers the executed <br />Agreements to OWNER, CONTRACTOR shall also <br />deliver to OWNER such Bonds as CONTRACTOR <br />may be required to furnish. <br />2.02 Copies of Documents <br />A. OWNER shall furnish. to CONTRACTOR up <br />to ten copies of the Contract Documents. Additional <br />copies will be famished upon request at, the cost of <br />reproduction. <br />2.03 Commencement of Contract Times; Notice <br />to Proceed <br />A. The Contract Times will commence to run on <br />the thirtieth day after the Effective Date of the Agree- <br />ment or, if a Notice to Proceed is given, on the day <br />indicated in the Notice to Proceed. A Notice to Pro- <br />ceed may be given at any time within 30 days after the <br />Effective Date of the Agreement. in no event will the <br />Contract Times commence to run later than the <br />ninetieth day after the day of Bid opening or the <br />thirtieth day after the Effective Date of the Agreement, <br />whichever date is earlier. <br />2.04 Starting the Work <br />.A. CONTRACTOR shall start to perform the <br />Work on the date when the Contract Times com- <br />mence to nun. No Work shall be done at the Site prior . <br />to the date on which the Contract Times commence to <br />run. <br />2.05 Before Starting Construction <br />equo A. CONTRACTOR's Review of Contract Docu- <br />se. meet& <br />auBefore undertaking each part of the Work,. <br />CONTRACTOR shall carefully study and compare the <br />00700 - General Conditions Master <br />00700 - 8 <br />FATUblic Works%ENGINEERING DIVISION PROJECT§W361RC Health Department Roof Replacement Projedll-Admin%Bid DocumentsWaster Contract Dooumenls=700- General <br />Conditions Master.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.