Laserfiche WebLink
.... ......:. <br />t�. <br />of CONTRACTOR's intention to cover the same and <br />ENGINEER has not acted with reasonable prompt- <br />ness in response to such notice. <br />13.04 Uncovering Work <br />A. If any Work is covered contrary to the written <br />request of ENGINEER, it must, if requested by ENGI- <br />NEER, be uncovered for ENGINEER's observation <br />and replaced at CONTRACTOR's expense. <br />B. If ENGINEER considers it necessary or <br />advisable that covered Work be observed by ENGI- <br />NEER or inspected or tested by others, CONTRAC- <br />TOR, at ENGINEER's request, shall uncover,'expose, <br />or otherwise make, available for observation, inspec- <br />tion, or testing as ENGINEER may require, that <br />OF ientity, GF aRy sus* faF; 9F employee OF agent e <br />ate-e€�Lem: <br />13.06 Correction or Removal of Defective Work <br />A. CONTRACTOR shall correct all defective <br />Work, whether or not fabricated, installed, or <br />completed, or, if the Work has been rejected by ENGI- <br />NEER, remove it from the Project and replace it, with <br />Work that is not defective. CONTRACTOR, shall pay <br />ail Claims, costs, losses, and damages (including but <br />not limited to all fees and charges of engineers, <br />architects, attorneys, and other professionals and all <br />court or arbitration or other dispute resolution costs) <br />arising out of or relating to such correction or removal <br />(including but not limited to all costs of repair or <br />replacement of work of others). - <br />portion of the Work in question, furnishing all neces- <br />sary labor, material, and equipment. If it is found that <br />13.07 Correction Period j <br />such Work is defective, CONTRACTOR shall pay all <br />' <br />Claims, costs, losses, and damages (including but not <br />A. if within one yeaF fteF the date of Substantial <br />limited to all fees and charges of engineers, architects, <br />GempletiGR OF SUGh l0AgeF peAgd, of time as may be <br />attorneys, and other professionals and all court or <br />arbitration or other dispute resolution costs) arising out <br />-------------------- =- of-or-relating-to-such-uncovering,-exposure,-observa-_.-._-___ <br />fiG <br />— ---- -S ------ ----...-- --- --- - - ? <br />tion, inspection, and testing, and of satisfactory <br />, any bund <br />replacement or reconstruction (including but not <br />defeGfive, <br />limited to all costs of repair or replacement of work of <br />' <br />others); and OWNER shall be entitled to an <br />y Laws and Regulations as <br />appropriate decrease in the Contract Price. If the <br />parties are unable to agree as to the amount thereof, <br />defective, GONTRA TOR shall prempfly, without <br />OWNER may make a Claim therefor as provided in <br />to OWNER and iA arseeFdanGe mO OWNER' <br />paragraph 10.05. if, however, such Work is not found <br />, <br />of <br />to be defective, CONTRACTOR shall be allowed an <br />, the defeGfive <br />increase in the Contract Price or an extension of the <br />Contract Times (or Milestones), or both, directly <br />attributable to such uncovering, exposure, <br />deferAive, <br />observation, inspection, testing, replacement, and <br />, to the <br />reconstruction. If the parties are unable to agree as to <br />the amount or extent thereof, CONTRACTOR may <br />#Gm If CONTRACTOR does not promptly comply <br />make a Claim therefor as provided in paragraph <br />with the terms of such instructions, or in an <br />10.05. <br />emergency where delay would cause serious risk of <br />loss or damage, OWNER may have the defective <br />13.05 OWNER May Stop the Work <br />Work corrected or repaired or may have the rejected <br />Work removed and replaced, and all Claims, costs, <br />losses, and damages (including but not limited to all <br />fails to s 61<411ed W9FWFS OF suitable <br />fees and charges of engineers, architects, attorneys, <br />FnateNals oF equipment, or fails to peFfbFm the WaFk 'A <br />and other professionals and all court or arbitration or <br />other dispute resolution costs) arising out of or relating <br />to such correction or repair or such removal and <br />TRAGTOR to Step the WGFk, OF any peirttion , <br />replacement (including but not limited to all costs of <br />eliminated; <br />repair or replacement of work of others) will be paid by <br />however-, this Fight of QVVNER to etop the WGFk shall <br />CONTRACTOR. <br />not give r4se to any duty en the paFt of OWNER to - <br />13. <br />, the <br />00700 - General Conditions Master <br />.00700-37 <br />F:1Publlc WorWENGINEERING DIVISION PROJECT9%17361RC Health Depertfient Roof Replacement Projedtl,AdminlSid DocumenteWaster Contract Documenlst00700 - General <br />:Corditions Masler.doc <br />