<br />t�.
<br />of CONTRACTOR's intention to cover the same and
<br />ENGINEER has not acted with reasonable prompt-
<br />ness in response to such notice.
<br />13.04 Uncovering Work
<br />A. If any Work is covered contrary to the written
<br />request of ENGINEER, it must, if requested by ENGI-
<br />NEER, be uncovered for ENGINEER's observation
<br />and replaced at CONTRACTOR's expense.
<br />B. If ENGINEER considers it necessary or
<br />advisable that covered Work be observed by ENGI-
<br />NEER or inspected or tested by others, CONTRAC-
<br />TOR, at ENGINEER's request, shall uncover,'expose,
<br />or otherwise make, available for observation, inspec-
<br />tion, or testing as ENGINEER may require, that
<br />OF ientity, GF aRy sus* faF; 9F employee OF agent e
<br />ate-e€�Lem:
<br />13.06 Correction or Removal of Defective Work
<br />A. CONTRACTOR shall correct all defective
<br />Work, whether or not fabricated, installed, or
<br />completed, or, if the Work has been rejected by ENGI-
<br />NEER, remove it from the Project and replace it, with
<br />Work that is not defective. CONTRACTOR, shall pay
<br />ail Claims, costs, losses, and damages (including but
<br />not limited to all fees and charges of engineers,
<br />architects, attorneys, and other professionals and all
<br />court or arbitration or other dispute resolution costs)
<br />arising out of or relating to such correction or removal
<br />(including but not limited to all costs of repair or
<br />replacement of work of others). -
<br />portion of the Work in question, furnishing all neces-
<br />sary labor, material, and equipment. If it is found that
<br />13.07 Correction Period j
<br />such Work is defective, CONTRACTOR shall pay all
<br />'
<br />Claims, costs, losses, and damages (including but not
<br />A. if within one yeaF fteF the date of Substantial
<br />limited to all fees and charges of engineers, architects,
<br />GempletiGR OF SUGh l0AgeF peAgd, of time as may be
<br />attorneys, and other professionals and all court or
<br />arbitration or other dispute resolution costs) arising out
<br />-------------------- =- of-or-relating-to-such-uncovering,-exposure,-observa-_.-._-___
<br />fiG
<br />— ---- -S ------ ----...-- --- --- - - ?
<br />tion, inspection, and testing, and of satisfactory
<br />, any bund
<br />replacement or reconstruction (including but not
<br />defeGfive,
<br />limited to all costs of repair or replacement of work of
<br />'
<br />others); and OWNER shall be entitled to an
<br />y Laws and Regulations as
<br />appropriate decrease in the Contract Price. If the
<br />parties are unable to agree as to the amount thereof,
<br />defective, GONTRA TOR shall prempfly, without
<br />OWNER may make a Claim therefor as provided in
<br />to OWNER and iA arseeFdanGe mO OWNER'
<br />paragraph 10.05. if, however, such Work is not found
<br />,
<br />of
<br />to be defective, CONTRACTOR shall be allowed an
<br />, the defeGfive
<br />increase in the Contract Price or an extension of the
<br />Contract Times (or Milestones), or both, directly
<br />attributable to such uncovering, exposure,
<br />deferAive,
<br />observation, inspection, testing, replacement, and
<br />, to the
<br />reconstruction. If the parties are unable to agree as to
<br />the amount or extent thereof, CONTRACTOR may
<br />#Gm If CONTRACTOR does not promptly comply
<br />make a Claim therefor as provided in paragraph
<br />with the terms of such instructions, or in an
<br />10.05.
<br />emergency where delay would cause serious risk of
<br />loss or damage, OWNER may have the defective
<br />13.05 OWNER May Stop the Work
<br />Work corrected or repaired or may have the rejected
<br />Work removed and replaced, and all Claims, costs,
<br />losses, and damages (including but not limited to all
<br />fails to s 61<411ed W9FWFS OF suitable
<br />fees and charges of engineers, architects, attorneys,
<br />FnateNals oF equipment, or fails to peFfbFm the WaFk 'A
<br />and other professionals and all court or arbitration or
<br />other dispute resolution costs) arising out of or relating
<br />to such correction or repair or such removal and
<br />TRAGTOR to Step the WGFk, OF any peirttion ,
<br />replacement (including but not limited to all costs of
<br />eliminated;
<br />repair or replacement of work of others) will be paid by
<br />however-, this Fight of QVVNER to etop the WGFk shall
<br />CONTRACTOR.
<br />not give r4se to any duty en the paFt of OWNER to -
<br />13.
<br />, the
<br />00700 - General Conditions Master
<br />.00700-37
<br />F:1Publlc WorWENGINEERING DIVISION PROJECT9%17361RC Health Depertfient Roof Replacement Projedtl,AdminlSid DocumenteWaster Contract Documenlst00700 - General