My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-004
CBCC
>
Ordinances
>
2010's
>
2018
>
2018-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 12:35:14 PM
Creation date
3/14/2018 12:35:14 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2018-004
Adopted Date
03/13/2018
Agenda Item Number
10.A.1.
Ordinance Type
Amendment
State Filed Date
03\14\2018
Entity Name
Land Development Regulations
Subject
Amendments to Chapter 914
Codified or Exempt
Codified
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2018- 004 <br /> routing of the site plan application materials and prior to the date the application is <br /> scheduled, by the planning division to be considered at a TRC meeting. TRC meeting <br /> date at which the application is scheduled to be considered. <br /> Prior to each TRC meeting, the planning division shall conduct an inter- <br /> departmental staff coordination meeting to coordinate draft comments and transmit <br /> post-coordination meeting draft comments to the applicant by email or similar <br /> medium prior to the TRC meeting. The technical review committee shall consider each <br /> application, shall complete a technical evaluation of the site plan application, and-shall <br /> identify any deficiencies or discrepancies, and for each comment shall either indicate <br /> that the comment involves a code, safety, or engineering requirement or that the <br /> comment is advisory. Comments shall consist of the draft comments and items <br /> discussed at the TRC meeting. Complete and final comments on all applications <br /> considered at the TRC meeting shall be assembled and forwarded to the applicant within <br /> four (4) working days. Applications At the discretion of the technical review <br /> committee, applications with substantial deficiencies may, upon post-TRC re- <br /> submittal, be rescheduled for re-review by the technical review committee at the <br /> discretion of the at another technical review committee meeting. <br /> (e) Resubmission, staff-level approval, and scheduling major site plans for planning and <br /> zoning commission consideration. The applicant's response to the TRC comments shall <br /> consist of five (5) revised plan sets, a traffic study if required by Chapter 952 <br /> regulations, a concurrency certificate or evidence of application for a concurrency <br /> certificate if required by Chapter 910 regulations and an itemized letter that recites <br /> each staff comment, details detailing how all of the discrepancies have been adequately <br /> addressed each comment has been adequately addressed, and states where any <br /> corresponding plan revision can be located. Once all deficiencies comments have been <br /> adequately addressed, all technical and informational requirements met, and the <br /> commenting members of the TRC have recommended approval or approval with <br /> conditions on the application, the application shall be approved by the community <br /> development director or his designee if staff-level approval, or scheduled for <br /> consideration before the planning and zoning commission if not staff level approval. <br /> 1. An applicant may request, at any time in the review process, that the application be <br /> forwarded to the planning and zoning commission for consideration. Said request <br /> shall be submitted to the planning division in writing and shall acknowledge that, in <br /> staffs opinion,the application is not ready for consideration due to a lack of adequate <br /> responses to staff and/or reviewing agency comments. <br /> (f) Approval of minor site plans. The TRC is authorized to approve, approve with conditions <br /> or deny minor site plan applications not requiring .: --'-. . --- Planning and <br /> Zoning Commission approval. Within seven(7)working days after the applicant submits <br /> to staff a complete response to TRC comments (also known as a resubmittal), the county <br /> shall either issue site plan approval or a discrepancy comment letter. Once all <br /> commenting TRC members have reviewed and approved the applicant's responses to <br /> comments, the minor site plan shall be signed and approved. All approved minor site <br /> plans shall be signed by the community development director or his designee. Appeals of <br /> Bold Underline: Additions to Ordinance <br /> Strike-through: Deleted Text from Existing Ordinance <br /> F:\Community Development\CurDev\Ordinances\2018Ordinances\2018- 914.06(1)and 914.06(5)-General thresholds and procedures for <br /> site plan review and approval and 914.14(3)-General Submittal Requirements.docx <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.