My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-048
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:24:33 PM
Creation date
3/14/2018 4:46:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/13/2018
Control Number
2018-048
Agenda Item Number
8.A.
Entity Name
Masteller & Moler, Inc.
Subject
Agreement for 45th St improvements
Area
43rd ave to 58th Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River <br />45th Street Milling & <br />RFQ # 2018012 <br />c. Project Approach <br />Kickoff Meeting: Following issuance of a Notice to Proceed, Masteller & Moler, Inc. (MM) shall coordinate <br />the scheduling of a Kickoff Meeting to discuss the specifics of this project. At the Kickoff Meeting, we expect <br />to confirm various design parameters to be applied to the project through a Preliminary Design Statement. <br />The Preliminary Design Statement will contain a Typical Section to be used for the project based on an <br />appropriately selected design speed. It is understood the County will provide the preferred paving cross- <br />section based on the County's geotechnical consultant's recommendation. <br />Route Survey Review: It is understood the County will provide the Route Survey for the project as was the <br />case for the design services we provided for 49th Street / Old Dixie Highway / U.S. Highway # I turn lane <br />improvements. Following receipt of the route survey, MM will review its contents in the field to confirm all <br />conditions have been accurately depicted. If necessary, we will coordinate with the County Surveying <br />Department to request additional information that may be needed or is essential for completion of the <br />project design. MM shall use the Route Survey provided by the County to create Base Plans for the project. <br />In preparation for submittal of this Statement of Qualifications, we have visited the project site no less than <br />five (5) times to familiarize ourselves with the apparent existing conditions. The existing corridor generally <br />contains a two (2) lane roadway with Type F curbing along the south edge of pavement and a four (4') wide <br />shoulder along the north edge of pavement. Existing, mostly wood poles supporting aerial utilities are <br />situated extremely close to the north edge of shoulder. <br />Existing Utility Coordination: MM shall coordinate directly with utility providers along the project route to <br />gain appropriate information as to the location of both aboveground and underground existing facilities <br />along the project route. We are aware the route contains County Utilities Department potable water, <br />gravity sewer (designed by MM), Florida Power & Light electric, and various communication providers. The <br />locations for these facilities will be depicted on the Base Plans for the project based on as -built information <br />to be provided by the specific utilitv providers. <br />Schematic Design Plans Preparation: Utilizing the Route Survey information from the County, MM shall <br />develop a Schematic Design depicting the proposed horizontal alignments for the 45th Street Milling and <br />Resurfacing Project. MM will develop existing cross-sections and superimpose the proposed typical cross- <br />section at each location. Using the drawn sections followed by field review, we will be able to discern what, if <br />any, grading issues may need to be worked out to assure proper transitions to existing grade and clear zones. <br />MM has already completed a detailed onsite review of the field conditions along the project route. As <br />stated above, the existing roadway contains a two (2) lane roadway with Type F curbing along the south <br />edge of pavement and a four (4') wide shoulder along the north edge of pavement. In order to minimize <br />construction costs, we anticipate using an economical Typical Section that maintains the alignment of the <br />existing south edge Type F curb and expands the paving six (6') feet to the north to accommodate the width <br />required to provide two (2) five (5') foot wide bike lanes. The entire roadway will remain sloped to the <br />CIVIVI <br />M 1�uiJ 1 LL ENGINEERS <br />ERS 1RSVLL' K itvL. C. PROJECT APPROACH PAGE 1 <br />M^^� <br />
The URL can be used to link to this page
Your browser does not support the video tag.