Laserfiche WebLink
M j MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS <br />EXHIBIT "C' <br />February 21, 2018 <br />Mr. William Johnson, PE; Roadway Production Engineer <br />INDIAN RIVER COUNTY ENGINEERING DIVISION <br />180127th Street <br />Vero Beach, Florida 32960 <br />RE: 45th Street Milling and Resurfacing Project <br />58th Avenue to 43rd Avenue <br />IRC -1722 (FDOT SCOP FM No. 436848-1) <br />Our File #1804 <br />Dear Mr. Johnson: <br />Thank you for the opportunity to offer the expertise and experience of Masteller & Moler, Inc. relative to the <br />above referenced project. Within this Proposal, Indian River COUNTY, the Client is referred to as "COUNTY". <br />Masteller & Moler, Inc. is referred to as "CONSULTANT". CONSULTANT proposes to provide COUNTY with the <br />necessary services to complete the following scope of work: <br />SECTION I - PROJECT LIMITS <br />The COUNTY desires to modify the existing two-lane 45th Street (generally between 58th Avenue & 43rd <br />Avenue) through milling and resurfacing to create a relocated two-lane road with (2)12' lanes and (2) S' bike <br />lanes as well as a 6' sidewalk. Within the limits of the roadway project, there will be a dedicated westbound <br />left -turn lane added at the 58th Avenue intersection. Where feasible, the Roadway Plans shall provide for <br />access management improvements at existing commercial operations along the corridor. The Plans shall also <br />incorporate locations for Go -line Stops along the corridor. (No Architectural Designs to be included.) <br />New mast arm signalization improvements are to be provided at the 45th Street / 43rd Avenue intersection to <br />replace the existing span wire systems as well as ADA compliant sidewalk landings at all four (4) corners. <br />Pedestrian movement signal improvements are to be provided to complement the mast arm signal at 43rd <br />Avenue. <br />The existing span wire support signalization at the 45th Street / 58th Avenue intersection shall be modified as <br />needed to support this project. At said intersection, ADA compliant sidewalk landings shall be provided at all <br />four (4) corners to include pedestrian movement signal improvements. No significant paving elevation <br />changes along 581h Avenue are anticipated for this project. <br />To facilitate the roadway improvements, the project will also include piping and filling Indian River Farms <br />Water Control District (IRFWCD) Sub -Lateral A-7 as necessary within the project limits. The culverting of Sub - <br />Lateral A-7 will also require a parallel sloped underdrain system composed of a perforated pipe in rock <br />surrounded by filter fabric. In addition, all culverts crossing under 451h Street shall be designed to be replaced <br />with reinforced concrete pipe (RCP). All associated side street drainage connections will be part of this <br />project. <br />1655 271 Street, Suite 2 • Vero Beach, Florida 32960 <br />Phone: (772) 567-5300 • Fax: (772) 794-1106 <br />mastmoir@bellsouth.net <br />(1) <br />