My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-048
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:24:33 PM
Creation date
3/14/2018 4:46:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/13/2018
Control Number
2018-048
Agenda Item Number
8.A.
Entity Name
Masteller & Moler, Inc.
Subject
Agreement for 45th St improvements
Area
43rd ave to 58th Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River COUNTY <br />02/21/2018 <br />Page 4 of 11 <br />45"' Street Milling & Resurfacing Project <br />IRC -1722 (FDOT SCOP FM No. 436848-1) <br />MM File #1804 <br />the existing sub -lateral and submittal of a Request for Verification of An Exemption to the <br />SJRWMD; <br />11. 30%, 60%, 90%, and 100% Submittals shall include the following: <br />i. Two (2) Sets of Signed & Sealed Final Plans (only). <br />ii. One (1) Opinion of Probable Construction Cost (90%/ 100%) <br />iii. One (1) CD with Drawings in PDF Format & CADD. <br />iv. The CONSULTANT will provide construction documents and calculations in sufficient <br />quantity as required by the various reviewing agencies. <br />C. Drainage Analysis and Plans: <br />1. It is anticipated no treatment and/or attenuation analysis is required for this project as the roadway <br />improvements portion of the project falls under St. Johns River Water Management District <br />(SJRWMD) 62-330.051(4)(c) Exemption Criteria. <br />In the event treatment & attenuation computations are required by the SJRWMD for this project <br />CONSULTANT shall perform the computations based on an off-site parcel of land to be selected by <br />COUNTY. <br />2. It is understood the IRFWCD will provide both the pipe size and invert elevations for the piping of <br />Sub -Lateral A-7; therefore, no pipe sizing computations will be required for this project. Consultant <br />shall provide the design for structures and the parallel underdrain system. <br />Consultant shall, however, develop existing storage volume computations for Lateral A-7 for use by <br />the COUNTY for determining whether or not compensatory storage volume will need to be <br />developed to offset loss of storage caused by pipine of the Sub -lateral. The existing Sub -lateral A-7 <br />storage computations described in this paragraph shall be provided as part of the 10% Submittal for <br />this project. <br />3. Roadway swales and all storm sewer pipes crossing 451h Street to be included with this project. All <br />non -RCP within the Indian River County right-of-way shall be replaced with RCP. RCP Culvert Cross - <br />drain Replacements shall be sized to carry a 4" per hour flow rate. <br />4. A Stormwater Pollution Prevention Plan (SWPPP) will be developed in conjunction with this project. <br />The site specific SWPPP is a requirement of both the EPA National Pollutant Discharge Elimination <br />System (NPDES) General Permit for Stormwater Discharges from Construction Activities and the FDEP <br />Generic Permit for Stormwater Discharge from Large and Small Construction Activities. <br />S. Erosion & Sediment Control Plans/ Notes <br />D. Jurisdictional Permitting: <br />The CONSULTANT shall prepare and submit permit applications for this project to the following agencies: <br />(4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.