Laserfiche WebLink
Indian River COUNTY <br />02/21/2018 <br />Page 6 of 11 <br />4P Street Milling & Resurfacing Project <br />IRG1722 (FDOT SCOP FM No. 436848-1) <br />MM File #1804 <br />side of 45a' Street. Water valve, water meter, and sewer manhole adjustments are also Included within <br />this project. <br />Unless otherwise specified above, any utility permitting and relocation design required to accommodate <br />the proposed improvements will be addressed as an additional service relative to this scope of work. This <br />scope of work does not include any design services for adjustment of water mains and /or force mains <br />other than as described above. <br />G. Signalization Plans: <br />Mast arm traffic signal configurations at the 45"' Street / 43rd Avenue intersection and span wire <br />supported signal modifications at the 450' Street / Wh Avenue intersection will be designed to meet <br />(applicable) current COUNTY and FDOTstandards. The pole analysis and design of the signal systems will <br />be completed and submitted to COUNTY for review. Signalization Plans will be included with the <br />Roadway Plans and submitted as indicated above. <br />SECTION III -TIME FOR COMPLETION & DELP4ERABLES/WORK PRODUCT <br />Upon authorization to proceed by the COUNTY, final design documents are expected to take approximately <br />130 working days from the Notice to Proceed (NTP). <br />1. Project shall be completed as follows: <br />Task <br />Route Survey <br />Working Days Upon BOCC Approval <br />40 following NTP <br />IRFWCD A-7 Ex. Storage Comp. / SIRWMD Permit Determination (10%) 15 following NTP <br />Schematic Submittal (30% Design Plans) 30 following 10% & Survey* <br />Preliminary Submittal (60% Design Plans) 60 following 30% <br />Complete Submittal (90% Design Plans) 20 following 60% <br />Final Submittal (Final Design Plans) 20 following 90% <br />*It is acknowledged by both parties CONSULTANT shall not proceed with 30% Schematic Design <br />services until COUNTY has established and agreed to IRFWCD Sub -Lateral A-7 compensatory storage <br />requirements. <br />2. Deliverables —The ENGINEER shall provide the COUNTY: <br />a. IRFWCD A-7 Ex. Storage Computations / SIRWMD Exemption Determination (10%) 2 Sets <br />b. Schematic Construction Plans (11"x17") (30%) 2 Sets <br />c. Preliminary Construction Plans (11"x17") (60%) 2 Sets <br />d. Final Construction Plans (11"x17") (90%) 2 Sets <br />e. Bid Ready Construction Plans (11"x17") (100%) 4 Sets <br />f. Permit Application Forms As Required <br />g. Related digital AutoCAD and PDF files <br />(6) <br />