Laserfiche WebLink
• Plan and review project work, scheduling, project layout, equipment, and <br />manpower utilization <br />• Coordinate, direct, and monitor activities of subcontractors and suppliers <br />• Maintain EEO compliance <br />• Maintain excellent safety and security practices for entire project <br />SAMPLE SUPERVISION OF .DOT PROJECTS: <br />• 1-95 E5K75 - Brevard County, Design Build Project $11.2M <br />Install drainage to 18 feet deep in median, jack and bores for Community <br />Asphalt Co. <br />• 1-95 E5N21 — Brevard County, Design Build Project $4.7M <br />Drainage, jack and bores for Hubbard Construction Co. <br />• State Road A1A Mud Creek — Fort Pierce, St. Lucie County $758K <br />Drainage, utility adjustments, road crossings for Dickerson Florida Inc. <br />• State Road Al 2B - Fort Pierce, St. Lucie County $1.1M <br />Drainage, watermain, forcemain, rock rubble for Dickerson Florida Inc. <br />• State Road AIA S. Ocean to Seaway— Fort Pierce, St. Lucie .County $2.1M <br />Drainage, watermain, forcemain, rock rubble for Dickerson Florida Inc. <br />• US -1 - Rio Mar — Fort. Pierce/Port St. Lucie, St. Lucie County $5.2M <br />Full-scale utility relocations, setting of arch plate pipe, sand cement riprap, <br />headwalls, steel sheeting, install pipe and box culverts for complete drainage <br />redesign for Hubbard Construction Co. <br />• State Road 76 Kanner Highway — Stuart, Martin County $180K <br />Drainage, modify drainage structure tops for realignment of roadway for <br />Dickerson Florida Inc. <br />• State Road 70 — Fort Pierce, St. Lucie County $1.1 M <br />Rock rubble, ditch lining, steel sheeting, drainage for J.W. Cheatham <br />• State Road 5 — Jupiter, Palm Beach County $760K <br />French drain, water utility offsets, force main relocations for Community <br />Asphalt Co. <br />