My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-038A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:43:43 PM
Creation date
3/15/2018 11:23:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2018
Control Number
2018-038A
Agenda Item Number
8.S.
Entity Name
Johnson-Davis, Inc.
Subject
Culvert Replacement
Area
74th Avenue and 1st Street SW
Project Number
1737
Bid Number
2018024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLE PROJECTS: <br />• SR 528. Widening from 1-4 to The Florida Turnpike, Orange County, FL, <br />Construction Manager - $92m widening, milling & resurfacing and bridge <br />replacement/reconstruction. <br />• North International Drive Improvements, City of Orlando, FL, Construction <br />Manager - $9m FDR roadway reconstruction & widening. <br />• 1-95 from SR 528 to SR 406, Brevard County, FL, Construction Manager - $59m <br />Design -Build to widen 1-95 from four to six lanes. <br />• 1-95 HOV Expansion, 10th to Summit, Palm Beach County, FL, Project Manager <br />- $45m widening and reconstruction of 1-95 and existing bridges from six to ten <br />lanes. <br />• 1-95 @ Bridge #168, Design -Build, Palm Beach County, FL, Project Manager - <br />$6m construction to widen 1-95 from six lanes to ten lanes and construct a single <br />span bridge over a quadruple box culvert. <br />• Dunn Avenue Extension, Volusia County, FL - Project Manager - $6.6m project <br />to extend Dunn Avenue from Williamson Blvd to Tomoka Farms Road with a <br />bridge over 1-95. <br />• SR 804 Improvements, Palm Beach County, FL, - Project Manager - $6m <br />roadway & bridge reconstruction of SR 804 from Old Boynton Beach Blvd to SR <br />5/US 1. <br />• Northlake Reliever, Palm Beach County, FL - Project Engineer - $7 Million new <br />roadway consisting of RE walls, 3 -span bridge over 1-95 and drainage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.