Laserfiche WebLink
ITEMIZED COST PROPOSAL 1-17-18 <br />PROJECT NAME: 74th AVENUE SW AND 1st STREET SW CULVERT REPLACEMENT <br />PROJECT NO: IRC -1737, BID NO. 2018024 <br />(, \' BIDDER'S NAME: Jo k nsom — <br />FAPublIG WorksIENGINEERING DIVISION PROJECTS11737 74th Ave and 1st SW Culvert Replacement%3-DesignlEstlmatesU737 Itemized Cost <br />Proposal 20180117 <br />MOBILIZATION <br />101-1 <br />LS <br />1 <br />l Oo0.4 <br />15 000.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />1A)SCO<00 <br />4A)500. 00 <br />104-1 <br />PREVENTION, CONTROL AND ABATEMENT OF EROSION <br />AND WATER POLLUTION <br />LS <br />1 <br />1, 600.00 <br />100. 04 <br />104-2 <br />BY-PASS PUMP & TEMPORARY CHECK DAMS <br />LS <br />1 <br />S, ciO, p <br />t, 900. 00 <br />110-1-1 <br />CLEARING & GRUBBING <br />LS <br />1 <br />CI,000.00 <br />011000. ©O <br />120-1 <br />REGULAR EXCAVATON <br />LS <br />1 <br />2,500- 00 <br />2,5©0. 00 <br />120-6 <br />EMBANKMENT <br />LS <br />1 <br />2-)2- 00- 00 <br />21100.00 <br />125-1 <br />EXCAVATION FOR STRUCTURES <br />CY <br />64 <br />l c)O <br />1,152 - 00 <br />160-4 <br />TYPE B STABILIZATION 12" THICK LBR 40 <br />SY <br />333 <br />�� -©D <br />G,�la3• o0 <br />., ,e-175-199 <br />PIPE CULVERT ROUND 120" SICD CSP <br />LF <br />50 <br />I� 1150-0(9 <br />57-0 <br />455-133-2 <br />SHEET PILING STEEL, TEMPORARY -CRITICAL <br />SF <br />420 <br />18•(70 <br />OC' <br />530-3-3 <br />RIPRAP, RUBBLE, F&I, BANK AND SHORE <br />TN <br />100 <br />1A) 000'C70 <br />530-3-4 <br />RIPRAP, RUBBLE F&I DITCH LINING <br />TN <br />30 <br />i '-to .00 <br />Z4)2 -00'<q0 <br />536-1-0 <br />GUARDRAIL -ROADWAY, GENERAL/LOW SPEED TL -2 <br />LF <br />175 <br />IC15 ' 00 <br />25, 37>. 00 <br />570-1-2 <br />PERFORMANCE TURF SOD BAHIA <br />SY <br />106 <br />i O - O p <br />1, ©6 <br />999-1 <br />IAS -BUILT DRAWING BY REGISTERED SURVEYOR <br />LS <br />1 <br />�> 1 O0 -o <br />3"100-00 <br />SUB -TOTAL <br />FORCE ACCOUNT <br />$ 17,000.00 <br />TOTAL PROJECT PROPOSAL (INCLUDING FORCE ACCOUNT) <br />74th AVENUE SW AND 1st STREET SW CULVERT REPLACEMENT TOTAL <br />17q X40 <br />TOTAL PROJECT COST PROPOSAL IN WORDS One- 4unt Rifn-ki µi►)e Th©1l5c�n d&� <br />it `V W-Qn e -d F4�7{-y¢ 2eho rem <br />NOTE,• IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />ND THE ITEMIZED C2§1 PROEM&E BID DO U E TS W GOVER . <br />LS=Lump Sum CY=Cublc Yard LF=Linear Foot TN=Ton SY=Square Yard <br />FAPublIG WorksIENGINEERING DIVISION PROJECTS11737 74th Ave and 1st SW Culvert Replacement%3-DesignlEstlmatesU737 Itemized Cost <br />Proposal 20180117 <br />